
Operation
7160-9001-560
01. December 2020
1. Select a menu item
Maintenance -> Monitor -> Behavior
components -> DPNet
- The entry window appears
2. Send a test message to process control
(Send)
Example
3. Activate process control
(DPProcessControl)
- If a connection is established, relevant
information appears in
DPProcessControl.
Example:
- Milking parlour view
- Responder "1001" at milking stall "1"
1001
Checking and setting the section in the Device menu
1. Check section in Device menu (Ad - dS)
See section: Commissioning / Installing a control unit in the DPNet network
6.7
Handing over to the owner
For further information, please refer to the manual of the connected system
7
Operation
Please refer to the corresponding manual of the connected system.