GEK-113000AE
F650 Digital Bay Controller
6-9
6 COMMISSIONING
6.8 VERIFICATION OF MEASUREMENT
6
Percent of Load-to-Trip
The relevant actual values displays are shown below:
ACUAL -> METERING ->
PRIMARY VALUES ->
CURRENT ->
% OF LOAD-TO-TRIP
Note
Percent of load-to-trip is calculated from the phase with the highest current reading. It is
the ratio of this current to the lowest pickup setting among the phase time and instantaneous overcurrent protection
features. If all of these features are disabled, the
value displayed will be “0”.
- Inject current of various values into Phase A.
- Verify that percent load-to-trip is calculated as the correct
percentage of the most sensitive operational Phase Overcurrent
element and displayed.
- Repeat for phases B and C.
6.8.3 ACTIVE, REACTIVE POWER, AND COSJ METERING
Equations to be applied for powers in a wye connection are as follows:
Apply the following current and voltage values:
With the indicated voltage and current values, verify that the power measure corresponds to expected values indicated in
the following table:
Maximum admissible error is ± 1% of the test value for P and Q, and 0.02 for cosj.
6.8.4 FREQUENCY
Frequency measure on channel VII (terminals A7-A8):
Apply 50 Vac at 50 Hz on channel VII. Maximum admissible error:± 10 mHz.
Apply 50 Vac at 60 Hz on channel VII. Maximum admissible error: ± 12 mHz.
Frequency measure on channel Vx (terminals A11-A12):
POWER PER PHASE
THREE-PHASE POWER
P=V*I*Cos
ϕ
P=Pa+Pb+Pc
Q=V*I*Sen
ϕ
Q=Qa+Qb+Qc
APPLIED VOLTAGE AND CURRENT VALUES PER PHASE
PHASE A
PHASE B
PHASE C
V-I ANGLES
VI = 50 V, 0º
VII = 50 V , 120º
VIII = 50V, 240º
ϕ
=45º
Ia = 10
∠
45º
Ib= 10
∠
165º
Ic = 10
∠
285º
Cos
ϕ
= 0.707
EXPECTED POWER VALUES
PHASE A
PHASE B
PHASE C
THREE-PHASE
Pa = 353.55 MW
Pb = 353.55 MW
Pc = 353.55 MW
P = 1060.66 MW
Qa = 353.55 MVAr
Qb = 353.55 MVAr
Qc = 353.55 MVAr
Q = 1060.66 MVAr
Содержание Multilin F650
Страница 66: ...2 38 F650 Digital Bay Controller GEK 113000AE 2 6 EXTERNAL CONNECTIONS 2 PRODUCT DESCRIPTION 2...
Страница 210: ...6 28 F650 Digital Bay Controller GEK 113000AE 6 18 THERMAL IMAGE ELEMENT 49 6 COMMISSIONING 6...
Страница 216: ...7 6 F650 Digital Bay Controller GEK 113000AE 7 4 RELAY CONFIGURATION 7 FREQUENTLY ASKED QUESTIONS 7...
Страница 256: ...A 36 F650 Digital Bay Controller GEK 113000AE A 1 LOGIC OPERANDS APPENDIX A A...
Страница 270: ...B 14 F650 Digital Bay Controller GEK 113000AE B 3 LINK LOSS ALERT LLA APPENDIX B B...
Страница 272: ...GEK 113000AE F650 Digital Bay Controller C 2 APPENDIX C C 1 FACTORY DEFAULT LOGIC C...
Страница 273: ...GEK 113000AE F650 Digital Bay Controller C 3 APPENDIX C C 1 FACTORY DEFAULT LOGIC C...
Страница 275: ...GEK 113000AE F650 Digital Bay Controller C 5 APPENDIX C C 1 FACTORY DEFAULT LOGIC C...
Страница 276: ...GEK 113000AE F650 Digital Bay Controller C 6 APPENDIX C C 1 FACTORY DEFAULT LOGIC C...
Страница 279: ...GEK 113000AE F650 Digital Bay Controller C 9 APPENDIX C C 1 FACTORY DEFAULT LOGIC C...
Страница 280: ...GEK 113000AE F650 Digital Bay Controller C 10 APPENDIX C C 1 FACTORY DEFAULT LOGIC C...
Страница 281: ...GEK 113000AE F650 Digital Bay Controller C 11 APPENDIX C C 1 FACTORY DEFAULT LOGIC C...