![GE Multilin D400 Скачать руководство пользователя страница 103](http://html.mh-extra.com/html/ge/multilin-d400/multilin-d400_instruction-manual_127214103.webp)
CHAPTER 7: SETTING UP THE D400 FOR REDUNDANCY
D400 SUBSTATION GATEWAY INSTRUCTION MANUAL
GE INFORMATION
103
3.
Enter
4. Peer IP Address (IP of Active D400)
.
Result: The D400 Redundancy Configuration Menu - Peer IP Configuration menu
appears.
4.
Specify the Peer IP address.
5.
Enter
8. D400 A/B Designation
.
Result: The D400 Redundancy Configuration Menu - Redundancy D400 Designation
(A/B) Configuration menu appears.
6.
Enter
2. D400_B
.
7.
Enter the remainder of the configuration settings identical to the primary D400. See
“Task 4: Hot standby - Configure the primary D400 for redundancy” on page 101.
8.
Enter
19. Reboot D400
and wait for a minute.
Result: All of the D400 applications are restarted and run in Hot-Standby mode.
This D400 (D400_B) communicates to the peer D400 (D400_A) and declares itself to be the
Standby D400 since the peer D400 is already in Active mode.
Task 6: Hot standby - Verify configuration
To verify that the configuration is correct:
1.
At the
D400#>>
command prompt of the primary D400, enter
d400cfg
.
2.
Enter 14. Redundancy
.
3.
Enter 1. Current Configuration
.
4.
Repeat the steps of this task for the secondary D400.
5.
Compare the primary and secondary configurations.
Task 7: Hot standby - Verify redundant D400 operation
To verify that the D400s are operating as redundant devices:
1.
Login to D400 remote-HMI and enter credentials.
2.
Click
Point Summary
button.
3.
Click the
Application
tab.
4.
Click
Redundancy Manager Details
.
5.
Repeat the steps of this task for the secondary D400.
6.
If the State of peer D400 point is Non Sync, then synchronize the configuration by
entering the
DirectOperate
->
PulseOn
command on the SyncConfig point.
7.
Compare the configurations.
8.
Confirm that the State of peer D400
pseudo point is Standby.
Содержание Multilin D400
Страница 12: ...12 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL PRODUCT SUPPORT ...
Страница 28: ...28 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL CHAPTER 1 BEFORE YOU START ...
Страница 34: ...34 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL CHAPTER 2 INSTALLING THE D400 ...
Страница 80: ...80 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL CHAPTER 4 CONNECTING TO DEVICES AND NETWORKS ...
Страница 88: ...88 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL CHAPTER 5 POWERING UP THE D400 ...
Страница 104: ...104 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL CHAPTER 7 SETTING UP THE D400 FOR REDUNDANCY ...
Страница 118: ...118 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL CHAPTER 9 ABOUT THE D400 APPLICATIONS ...
Страница 126: ...126 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL CHAPTER 10 INTRODUCING THE D400 CONFIGURATION ...
Страница 158: ...158 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL CHAPTER 12 USING THE D400 LOCAL CONFIGURATION UTILITY ...
Страница 174: ...174 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL APPENDIX A STANDARDS PROTECTION ...
Страница 184: ...184 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL APPENDIX C LIST OF ACRONYMS ...
Страница 192: ...192 GE INFORMATION D400 SUBSTATION GATEWAY INSTRUCTION MANUAL INDEX ...