○
The customer shall provide the power supply cables between the transformer and the
UPS of the LD cabinet (for LD system option).
○
The LDM optional system must be powered through a wall circuit breaker or equivalent
device with LOTO capability. This circuit breaker must have a 30 amps current rating.
Procurement, delivery and installation of this device is customer responsibility.
•
The customer shall provide Power supply cables between the main transformer and the
system:
○
Main supply: 3 1 ground (+ 1 neutral if Fluoro UPS option present)
○
Cables from PDB to Jedi (LAT and FRT)
○
Cables from PDB to Tube Chillers (LAT and FRT)
○
Cable from PDB to modular PDU inside C2 cabinet
○
Cable from PDB to the fluoro UPS
•
Injectors: If Injector is not powered by the PDB, it is the customer responsibility to ensure the
compliance of installation by referring to injector's documentation.
Innova
TM
IGS 620, Innova
TM
IGS 630 Preinstallation Manual
Direction 5694389-1-1EN, Revision 2
166
1 Power Requirements
Содержание Innova IGS 620
Страница 2: ...InnovaTM IGS 620 InnovaTM IGS 630 Preinstallation Manual Direction 5694389 1 1EN Revision 2 2...
Страница 207: ......