3 Room Structural Requirements
3.1 Floor Requirements
3.1.1 General Vascular GE Healthcare Policy
GE Healthcare’s Customer is responsible for the structural analysis and mounting of the base
plates. If GE Healthcare is forced to mount the base plate, the Local Customer Team must hire
a structural engineer to design and approve the mounting method and provide GE Healthcare
with an engineering report.
The floor level cannot exceed a general levelness of 5 mm (0.2 in) for any 2 meters (79 in).
NOTICE
The floor slabs on which the equipment is to be installed must have a levelness
of 1 mm (0.04 in) per meter (40 in). Position of baseplates and table basement
depends on the type of installation. The three types of installation are given in
Illustration 2-44:
The preferred installation method for the Innova Frontal and Lateral Positioner or the Omega
tables is through-bolting. The through-bolting method can be used in all seismic zones. If
through-bolting cannot be used, use provided floor anchors instead.
Innova
TM
IGS 620, Innova
TM
IGS 630 Preinstallation Manual
Direction 5694389-1-1EN, Revision 2
108
3 Room Structural Requirements
Содержание Innova IGS 620
Страница 2: ...InnovaTM IGS 620 InnovaTM IGS 630 Preinstallation Manual Direction 5694389 1 1EN Revision 2 2...
Страница 207: ......