Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare
Direction 5314528-2-1EN, Revision 1
5 Pre-Installation Checklist
GE Healthcare Site Readiness Checklist
GEHC Global Order # :
Customer:
GEHC On-site Representative :
MI Supplier:
Name of customer reviewed with :
Lead Installer:
GEHC PMI :
Phone Number:
Target Site Prep Completion Date:
Helper:
The customer is responsible for proper site preparation and site readiness regardless of any GEHC inspections/assessments.
For MR Magnet Delivery: Ensure cryogen vents, power for the cooling system and exhaust fan system are installed and operational (0.7T,
1.5T & 3T) and chilled water supply is available 24x7 that meets system cooling equipment requirements.
Inspection Date:
Predict
(Pre-ship)
Item
#
GEHC Minimum Requirements
Storage:
Is item
ready?
Is this
item
ready?
Will
item be
ready?
Verify
(Delivery):
Is item
ready?
Validate
(Mech
Install):
Is item
ready?
Comments
If "N", please enter in
comments or action plan
1
Equipment installation drawings must
match actual room size and must meet
clearance requirements. Deviations
that meet installation requirements may
be red-lined, if red-lining is allowed by
local code. Seismic requirements are
identified on construction drawings.
X
2
Delivery route to installation or storage
area meets requirements and has
been discussed and scheduled with the
customer. Ensure floor protection is
discussed, requirements identified, and
will be available at time of delivery and
installation.
X
3
Rooms that will contain equipment,
including storage areas, are dust free.
Room security to prevent unauthorized
access and theft has been discussed
with customer. The customer is aware of
these security issues, implications and
responsibility.
4
In room HVAC ductwork and units (in
room) must be mechanically installed
and dust free. Installation rooms appear
to meet environmental conditions (see
Further Definitions) and observed
issues have been communicated to the
customer. If being stored, storage area
must meet PIM storage criteria.
5
Ceiling grid is installed, Unistrut is
located per the installation drawings,
and permanent lighting is installed and
operational.
X
6
Floor is clean and prepared for final floor
covering. Customer has verified floor
leveling meets the equipment installation
drawings and PIM specs and no visible
defects are observed. Gantry and table
baseplate are installed prior to delivery
(if applicable)
X
Chapter 7 Additional Planning Aids
213