GE Innova 2100-IQ Скачать руководство пользователя страница 114

Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual

GE Healthcare

Direction 5314528-2-1EN, Revision 1

Illustration 5-17: Detector Chiller Thermo-Con Dimensions

114

1 Dimension Drawings

Содержание Innova 2100-IQ

Страница 1: ...GE Healthcare Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual OPERATING DOCUMENTATION 5314528 2 1EN Revision 1...

Страница 2: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2...

Страница 3: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Important Information LANGUAGE Important Information 3...

Страница 4: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 4 Important Information...

Страница 5: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Important Information 5...

Страница 6: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 6 Important Information...

Страница 7: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Important Information 7...

Страница 8: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 8 Important Information...

Страница 9: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Important Information 9...

Страница 10: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 10 Important Information...

Страница 11: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Important Information 11...

Страница 12: ...nova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 This page left intentionally blank 12 Important Informatio...

Страница 13: ...al GE Healthcare Direction 5314528 2 1EN Revision 1 Revision History Part Rev Date Reason for Change Pages 5314528 1 1EN rev 1 30 July 2008 Initial release 302 5314528 2 1EN rev 1 December 19 2008 Ini...

Страница 14: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 This page left intentionally blank 14 Revision History...

Страница 15: ...va 3100 3100 IQ and 4100 4100 IQ Case 27 1 3 Description of the X Ray generator 27 1 4 Description of the X Ray head 28 1 5 Description of the Innova Imaging System 28 1 6 Description of the image mon...

Страница 16: ...Support Suspension 42 3 7 System Compatibilities Cross Reference 21 53 CM 17 43 CM 18 19 Monitors 43 4 Optional Innova System Components 44 4 1 System Compatibilities Cross Reference Omega Table Sub S...

Страница 17: ...dows and curtains 57 3 Structural Requirements 58 3 1 Room Size 58 3 2 Door Size Requirements 58 3 2 1 Door Height 58 3 2 2 Door Width 58 3 3 Floor 58 3 3 1 General Vascular GEMS Policy 58 3 3 2 Floor...

Страница 18: ...t Constraints 80 2 Room Layout Drawings 81 2 1 Room layout and room min length 82 2 2 Room Layout for Innova System example 1 2 Suspension rails parallel to table 84 2 3 Room Layout for Innova System...

Страница 19: ...Injector Mounting Requirements 147 CHAPTER 6 ELECTRICAL CONNECTIONS 149 1 Power Distribution 149 2 Recommended Power Distribution System 152 2 1 Main functions 152 2 2 Typical PDB Europe CE 153 2 3 Ty...

Страница 20: ...ts 181 16 Physical Runs 184 16 1 Physical Run Synoptic 184 16 2 System Core Matrix 185 16 3 PHYSICAL RUN SYSTEM CORE DETAIL 192 17 PIST0021 US Fluoro UPS and PDB connection 195 17 3 1 Connection of th...

Страница 21: ...ion 1 2 Tools and Test Equipment 208 3 Route Survey 210 3 1 Step One Sketch 210 3 2 Step Two Survey 210 3 3 Step Three Check 210 4 European Process Order Select 212 5 Pre Installation Checklist 213 CH...

Страница 22: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 This page left intentionally blank 22 Table of Contents...

Страница 23: ...es references to the pre installation documents of the various product included with an Innova System These documents are intended to assist the Installation Specialist and the Site Planner in properl...

Страница 24: ...ies as appropriate Tool and Test Equipment Chapter 7 Section 2 Tools and Test Equipment Pre Installation Checklist Chapter 7 Section 5 Pre Installation Checklist Contract Changes Be sure to inform the...

Страница 25: ...M LAYOUTS ELECTRICAL CONNECTIONS and ADDITIONAL PLANNING AIDS of this manual They represent an important part of the pre installation process The checklists summarize the required preparations and all...

Страница 26: ...va 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 This page left intentionally blank 26 3 Pre Installation Pro...

Страница 27: ...allation 1 2 Description of the Innova Patient table 1 2 1 Innova 2100 IQ Case Innova 2100 IQ System can be supplied with an OMEGA IV Compact patient table an OMEGA V long patient table which includes...

Страница 28: ...DU and the Jedi generator C2 cabinet positioner control Fluoro UPS interface box near C1 cabinet Fluoro UPS option VCIM console Revolution Digital Detector mounted on Innova LC positioner An external...

Страница 29: ...ver Emitter 2 DL color LCD monitor 19 3 Keyboard 4 Mouse 5 Keypads for user dialogue 6 Video station Hi Brite monitor in a user area VCR in option 1 8 AW workstation 2 monitors 19 flat panel and 1 mon...

Страница 30: ...loor and elevator loading capacity Check the integrity of the UPS equipment carefully If you notice visible damage do not install or start the UPS Contact the nearest Service Center immediately WARNIN...

Страница 31: ...ifferential breaker is placed on the hospital main supply upstream the PDB the differential shall be set to 300 mA Switching OFF the unit does not isolate the UPS from the utility Do not install the U...

Страница 32: ...ents for IntraVascular UltraSound imaging designed as add on equipment to Vascular Imaging systems The IVUS s5i GE equipment is also capable of recieving patient data from the Innova system The Volcan...

Страница 33: ...duct Illustration 2 2 Innova LC positioner including L arm Item 1 Pivot Item 2 C arc Item 3 Motorized elevator Item 4 for the Revolution Digital Detector X ray tube Item 5 Siemens collimator Item 6 21...

Страница 34: ...100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 2 C1 Cabinet Illustration 2 3 2 3 C2 Cabinet Illustration 2 4 34 2 Innova P...

Страница 35: ...Q 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 4 Omega Patient Table Illustration 2 5 2 5 Tilt Patient Table Illustration 2 6 C...

Страница 36: ...2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 6 User Interface Illustration 2 7 36 2 Innova Product Identif...

Страница 37: ...Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 7 Fluoro UPS Illustration 2 8 NOTE Refer to the UPS vendor Service manual Installation Guide SG Serie 10 20 30 40 kVA for mo...

Страница 38: ...100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 9 X Ray Tube Chiller Illustration 2 10 2 10 Digital Detector Chillers Illustration 2 11...

Страница 39: ...2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 11 Innova User Area Illustration 2 12 Chapter 2 Innova Syste...

Страница 40: ...2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 12 IVUS Option Illustration 2 13 40 2 Innova Product Identifi...

Страница 41: ...s Sub System PRODUCT NAME MODEL NUMBER PRE INSTALLATION DOCUMENT NUMBER NOTES TILT TABLE 2354463 This document OMEGA IV TABLE 2320221 3 This document Includes tabletop OMEGA V LONG TABLE 2320045 5 Thi...

Страница 42: ...59035 This document Innova 4100 41 cm Revolution Digital detector 2329766 This document Detector Chiller Thermo Tek with Innova 2100 IQ 2387548 This document Detector Chiller Thermo Con with Innova 31...

Страница 43: ...6 m 5126896 2378538 or 2378540 2393190 100 3 7 System Compatibilities Cross Reference 21 53 CM 17 43 CM 18 19 Monitors PRODUCT NAME MODEL NUMBER PRE INSTALLATION DOCUMENT NUMBER CATALOG NUMBER 17 43 c...

Страница 44: ...ATALOG NUMBER SMART HANDLE 2237456 3 5127605 This document SMART BOX 2237457 3 5127604 This document TSSC SP W CF 2347973 5127602 This document Note 1 w CF means with Contour Filter and w o CF means w...

Страница 45: ...ARE CREATING AIR CIRCULATION OF PULSED AIR WHEN THIS PULSED AIR IS IN AN ENVIRONMENT THAT MAY CONTAIN AIRBORNE PATHOGENS LIKE AN EXAM ROOM CONTROL ROOM THERE IS A RISK OF TRANSMISSION OF THESE AIRBORN...

Страница 46: ...west temperature e g 10 C 50 F and humidity is preferable If they are to be stored outside of their shipping box or in the inner shipping box without plastic wrapping they should be stored at 20 C 68...

Страница 47: ...PORT MIN MAX MIN MAX MIN MAX MIN MAX Examination room 0 3000 30 3000 70 106 70 106 Technical room See Notice below 0 3000 30 3000 70 106 50 106 Control room 0 3000 0 3000 N A N A N A N A The chiller i...

Страница 48: ...Room Main disconnect panel PDB 0 4 1534 0 45 1534 0 45 1534 0 45 1534 Total for core system 4 6 15762 7 0 24020 8 9 30324 11 7 39881 Room Options 3 5 Stand by Moderate Use 4 Typical Use 4 Maximum Use...

Страница 49: ...ing to Standard IEC 62040 1 2 Do not put anything on the top of the cabinet If the UPS is placed on a raised floor the airflow for UPS cooling should enter from underneath the UPS through the appropri...

Страница 50: ...TOR IS RESPONSIBLE FOR PROVIDING AND CONNECTING THE CABLES FROM THE PDB TO THE UPS AND CONFIGURING THE PDB IN BYPASS MODE GEHC IS RESPONSIBLE FOR POWERING ON THE SYSTEM WITH THE UPS IN BYPASS MODE GED...

Страница 51: ...nfection refer to operator manual Chapter Safety and Regulatory section Disinfection recommended disinfecting agents Degree of safety of application in the presence of a flammable anesthetic mixture w...

Страница 52: ...ny interference in nearby electronic equipment Harmonic emissions IEC 61000 3 2 Not applicable The Innova system is suitable for use only in establishments not directly connected to a public low volta...

Страница 53: ...ns on power supply input lines IEC 61000 4 11 0 Un for 5 sec 0 Un for 5 sec Mains power quality is that of a typical commercial and or hospital environment If the user of the Innova system requires co...

Страница 54: ...is fully operational 3 V m 800 MHz to 2 5 GHz E3 0 3 V m At that disturbance amplitude the monitor image might present some slight flicker For image quality improvement the monitor might be removed fr...

Страница 55: ...here P is the power rating of the transmitter in watts W according to the transmitter manufacturer NOTE These are guidelines Actual conditions may vary 2 4 4 Limitations Management Adhering to the dis...

Страница 56: ...m have to be all AC power supplied by the same power distribution panel line NOTE In order to avoid interferences the same AC power distribution panel should supply all components accessories the Inno...

Страница 57: ...se on radiation protection in x ray rooms 2 6 Audible noise Less than 50 dB A at 1 meter for an Innova LC Positioner Limited to 50 dB A at 1 meter for Omega IV Omega V and Tilt tables Limited to 55 dB...

Страница 58: ...e protective side rail removed on site NOTE Door widths are based on a straight in approach requiring a 2 44 m 96 in wide corridor Calculations need to be made for accommodation of equipment through n...

Страница 59: ...or requirements when using provided floor anchors The maximum pullout force per provided anchor was calculated assuming A concrete compression strength of 17 24 MPa at 28 days which is the minimum req...

Страница 60: ...8 2 1EN Revision 1 NOTE For specific floor preparation procedures refer to PIM Innova 2000 2100 IQ 3100 4100 Cardiovascular Imaging System Pre Installation Kit Installation Procedures Illustration 3 4...

Страница 61: ...r Mounting Template contained in Chapter 5 Section 2 Mounting Requirements 3 3 4 Hole dimension and preferred location in concrete floor In the examination room the Innova LC Positioner is not placed...

Страница 62: ...IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 3 6 Hole location in concrete floor 62 3 Structural Re...

Страница 63: ...but the height of the outcoming conduit plus bushing is limited to 1 2 in 12 7 mm NOTE Refer to table Chemical anchors Pull out efforts and recommendations in Chapter 5 Section 2 Mounting Requirement...

Страница 64: ...GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 3 7 Water Conduit location In some countries depending on local regulations it may be forbidden to run electrical cables and water pipes i...

Страница 65: ...00 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 3 8 Water Conduit location Illustration 3 9 Cable Curvature Chapter 3 Phy...

Страница 66: ...hored to the floor See Chapter 2 Section 3 Basic Innova LC System Compatibility for referential documents C1 C2 Cabinets Wall support 2285242 Every sub system is delivered on site with its proper seis...

Страница 67: ...lab Securing a supplementary channel to the bottom of the vertical members and mounting the stationary rails to this channel can greatly reduce the number of vertical members The stationary rail suppo...

Страница 68: ...ation 3 11 SPECIFICATIONS FOR A TYPICAL 17 10 5 44 M INBOARD STATIONARY RAIL MOUNTING INTERFACE BOTH RAILS CEILING MOUNTED Table 3 12 Stationary rail in different length Rail length mm ft A C D INBOAR...

Страница 69: ...on 5314528 2 1EN Revision 1 3 4 4 Boom Mounted for Monitor Suspension One type of boom mounted is supplied as counterpoised monitor suspension not adjusted on site as follows for 2 x 21 53 cm EIZO Gmb...

Страница 70: ...Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 3 12 Recommended locations for 3 monitor suspension A recommended location for 3 monitor suspension is defined to...

Страница 71: ...5 Walls 3 5 1 General requirement The C1 Cabinet the C2 Cabinet and the PDB Cabinet must be securely fastened to the wall to prevent them from tipping 3 5 2 Seismic Areas NOTE For Fluoro UPS option US...

Страница 72: ...3 4 wires 3 ph GND Table 3 14 ELECTRICAL REQUIREMENTS System line voltage with Fluoro UPS UL Peak Max Power input kVA Frequency Hz Mains Voltage V Max Line Impedance ohms Peak Current A Average Curren...

Страница 73: ...iller at 380 VAC 50 Hz With a main power supply at 360 VAC 60 Hz use an autotransformer to supply the Chiller at 480 VAC 60 Hz For PDU C1 Cabinet the voltage range is 380 VAC 10 to 20 PDU setting 342...

Страница 74: ...which provide a type 3 5 mm Jack plug for connecting external audio device 4 3 Room Lighting See Illustration Room Lighting for Innova System in Chapter 4 Section 2 Room Layout Drawings for a recomme...

Страница 75: ...patient on table during an examination the operator can require a help with a Surgical Imaging mobile unit to finish the examination In this case a wall outlet single phase ground is required to feed...

Страница 76: ...inside the C1 cabinet A dedicated phone line with a local socket used only for a connection to a modem will preferably be located close to the cabinet The phone outlet must be located less than 1 met...

Страница 77: ...room e g wall device be greater than 50 cm 19 7 in or 65 mm 25 6 in if the Header Extender is used taking into account the fact that the Tilt table can rotate 180 Provide sufficient space around the p...

Страница 78: ...ency Stop from accidental actuation 1 6 Patient Environment Equipment The components that may be installed within patient vicinity need to be medical equipment patient vicinity is defined in the stand...

Страница 79: ...System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 1 7 Preference Cabinet locations Illustration 4 1 The service area dimensions shown above are just an example Service ar...

Страница 80: ...2 1EN Revision 1 1 8 Layout Constraints The X Ray tube Chiller elevation cannot exceed 3 meters 9 84 feet in height Minimum distance between Digital Detector and UPS is 3 m 118 inches Fluoro UPS opti...

Страница 81: ...THOGENS FROM PATIENTS TO OTHER PATIENTS OR CLINICAL PERSONNEL NOSOCOMIAL DISEASES TO REDUCE THIS RISK THE ELECTRONIC CABINETS MUST BE INSTALLED IN A ROOM SEPARATED FROM EXAM ROOM CONTROL ROOM I E TECH...

Страница 82: ...ht Recommended 32 ft 0 in 9 75m 20 ft 0 in 6 00 m 10 ft 0 in 3 05 m Minimum For minimum exam room lengths see different table configurations in Illustration 4 2 Illustration 4 3 and Illustration 4 4 1...

Страница 83: ...n Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 4 3 Omega V or Tilt Table Angio Cardio Neuro without header extender requirement 500 mm Illustration 4 4 Omega IV or Tilt Table w...

Страница 84: ...ing System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 2 Room Layout for Innova System example 1 2 Suspension rails parallel to table Illustration 4 5 Example 1 suspensi...

Страница 85: ...100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 4 6 Example 2 suspension rails either side of patient table Chap...

Страница 86: ...LLED IN A ROOM SEPARATED FROM EXAM ROOM CONTROL ROOM I E TECHNICAL ROOM Legend of Illustration 4 5 1 Innova LC positioner 2 Patient table 3 C1 Cabinet 4 C2 Cabinet 5 Chiller Coolix 4000 X Ray tube hou...

Страница 87: ...allation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 3 Room Layout for Innova System example 3 Illustration 4 7 Example 3 suspension perpendicular to patient table Monitor suspension sho...

Страница 88: ...LLED IN A ROOM SEPARATED FROM EXAM ROOM CONTROL ROOM I E TECHNICAL ROOM Legend of Illustration 4 7 1 Innova LC positioner 2 Patient table 3 C1 Cabinet 4 C2 Cabinet 5 Chiller Coolix 4000 X Ray tube hou...

Страница 89: ...Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 4 Room Layout for Innova System example 4 Illustration 4 8 Example 4 suspension perpendicular t...

Страница 90: ...LLED IN A ROOM SEPARATED FROM EXAM ROOM CONTROL ROOM I E TECHNICAL ROOM Legend of Illustration 4 8 1 Innova LC positioner 2 Patient table 3 C1 Cabinet 4 C2 Cabinet 5 Chiller Coolix 4000 X Ray tube hou...

Страница 91: ...4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 5 Room Lighting for Innova System Illustration 4 9 Room Lighting for Innova Syste...

Страница 92: ...LLED IN A ROOM SEPARATED FROM EXAM ROOM CONTROL ROOM I E TECHNICAL ROOM Legend of Illustration 4 9 1 Innova LC positioner 2 Patient table 3 C1 Cabinet 4 C2 Cabinet 5 Chiller Coolix 4000 X Ray tube hou...

Страница 93: ...ardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 6 Room Layout for Innova System example with Mobile system 9800 Illustration 4 10 Room Layout fo...

Страница 94: ...LLED IN A ROOM SEPARATED FROM EXAM ROOM CONTROL ROOM I E TECHNICAL ROOM Legend of Illustration 4 10 1 Innova LC positioner 2 Patient table 3 C1 Cabinet 4 C2 Cabinet 5 Chiller Coolix 4000 X Ray tube ho...

Страница 95: ...IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 3 IVUS Option 3 1 Functional Diagram Illustration 4 11 Chapter 4 Roo...

Страница 96: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 This page left intentionally blank 96 3 IVUS Option...

Страница 97: ...t Table Interference Regions Illustration 5 8 Tilt Patient Table Interference Regions Illustration 5 9 Omega Table side clearence CPR access Illustration 5 10 Innova LC Positioner and Omega IV Compact...

Страница 98: ...ardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 1 Innova LC Positioner Dimensions Side View Illustration 5 2 Innova LC Positioner D...

Страница 99: ...3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 3 Innova LC Positioner Dimensions Top view Chapter 5 Physical...

Страница 100: ...3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 4 Omega IV Compact Patient Table Dimensions 100 1 Dimen...

Страница 101: ...3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 5 Omega V Long Patient Table Dimensions Chapter 5 Physical C...

Страница 102: ...100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 6 Tilt Patient Table Dimensions 102 1 Dimension D...

Страница 103: ...n Manual GE Healthcare Direction 5314528 2 1EN Revision 1 NOTE With a Tilt Table the minimum distance from table pivot to the medical Gas Box is 600 mm and the maximum dimensions of the medical Gas Bo...

Страница 104: ...Q 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 7 Omega IV Compact Patient Table Interference Regions Innova 2100 I...

Страница 105: ...IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 8 Omega V Long Patient Table Interference Regions Chapter 5 Physi...

Страница 106: ...Q 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 9 Tilt Patient Table Interference Regions 106 1 Dimens...

Страница 107: ...3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 10 Omega Table side clearence CPR access Chapter 5 Physical...

Страница 108: ...rdiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 11 Innova LC Positioner and Omega IV Compact Patient Table Relative Positions Innova...

Страница 109: ...Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 12 Innova LC Positioner and Omega V Long Patient Table Relative Positions side vie...

Страница 110: ...va 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 13 C2 Cabinet Dimensions 110 1 Dimension Draw...

Страница 111: ...IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 14 C1 Cabinet Dimensions Chapter 5 Physical Characte...

Страница 112: ...llustration 5 15 Floor Space Diagram for Lytron Chiller The maximum elevation difference between X Ray Tube Housing and Chiller is around 3 meters 10 ft Exact dimensions of the Coolix 4000 chiller dep...

Страница 113: ...r Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 16 Detector Chiller Thermo Tek Dimensions The chiller cannot be located more than 3 m 10 ft bel...

Страница 114: ...Q 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 17 Detector Chiller Thermo Con Dimensions 114 1 Dimens...

Страница 115: ...4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 18 Detector Chiller Thermo Tek Configuration Orientation Chapter 5 P...

Страница 116: ...UL Layout Optional The left right or back side of the UPS cabinet can be positioned against the wall The front side of the UPS cabinet must be accessible for maintenance operation Clearance around the...

Страница 117: ...lation and to make easier the maintenance operations for UPS and battery we recommend a minimum distance of 200 mm 8 from the wall The right side of the UPS cabinet must be accessible for maintenance...

Страница 118: ...ova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 22 UPS IF Box Optional 118 1 Dimension Drawi...

Страница 119: ...e Direction 5314528 2 1EN Revision 1 Illustration 5 23 Gas box outlets Omega IV NOTE With a Tilt Table the minimum distance from table pivot to the medical Gas Box is 600 mm and the maximum dimensions...

Страница 120: ...althcare Direction 5314528 2 1EN Revision 1 Illustration 5 24 Gas box outlets Omega V NOTE With a Tilt Table the minimum distance from table pivot to the medical Gas Box is 600 mm and the maximum dime...

Страница 121: ...IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 25 DL Keypad Dimensions Chapter 5 Physical Character...

Страница 122: ...2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 26 DL Image Monitor Dimensions 122 1 Dimension D...

Страница 123: ...GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 27 VCR Mounting Holes Location NOTE Unscrew the four feet on the bottom Use these four holes to fix the VCR The mounting holes accommoda...

Страница 124: ...ega V 571 5x429 22 5x16 9 2410 kg m2 492 3 lb ft2 Table 900 1983 See note 1 Tilt 750x600 30x24 2000 kg m2 409 lb ft2 Same as Innova LC Positioner See IMPORTANT NOTICE below IMPORTANT NOTICE The Table...

Страница 125: ...2 4 4 38 96 177 Control Station 4 8 8 120 360 240 Joystick 1 2 2 90 76 102 Isolation transformer 7 15 4 97 267 171 IVUS CPU 15 33 1 396 162 510 IVUS Keyb mouse pad 1 2 2 NA NA NA IVUS monitor 15 33 1...

Страница 126: ...able 5 3 cont d Title Illustration Inner Base Plate For Above Grade Floor Anchor Kit Illustration 5 31 Innova LC Positioner And Tilt Table Floor Mounting Template Illustration 5 33 and Holes location...

Страница 127: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 28 Chapter 5 Physical Characteristics 127...

Страница 128: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 29 128 2 Mounting Requirements...

Страница 129: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 30 Chapter 5 Physical Characteristics 129...

Страница 130: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 31 130 2 Mounting Requirements...

Страница 131: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 32 Chapter 5 Physical Characteristics 131...

Страница 132: ...ides the recommended chemical anchors for Omega LC baseplates and for the floor plate ordered locally that they could be used instead of bolts provided by GE Table 5 4 Chemical anchors Pull out effort...

Страница 133: ...e baseplate Omega Table Omega Floor plate to be ordered locally Minimum floor thickness 180 mm 7 in 220 mm 8 1 2 in 220 mm 8 1 2 in 180 mm 7 in Max Tightening Torque 80 N m 59 ft lb 150 N m 110 ft lb...

Страница 134: ...IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 5 33 Gantry and table mounting holes 134 2 Mounting Re...

Страница 135: ...istance ANGIO CARDIO CARDIO NEURO Omega IV Compact NA 1395 mm 54 9 in Omega V Long 1278 mm 50 3 in 1395 mm 54 9 in Omega V non motorized Long 1278 mm 50 3 in 1395 mm 54 9 in Tilt Table 1278 mm 50 3 in...

Страница 136: ...are mandatory to install the table patient support The Table must never be installed on grade The Omega Tilt Table baseplate is recommended if a future Omega to Tilt table upgrade is to be considered...

Страница 137: ...althcare Direction 5314528 2 1EN Revision 1 Floor plate Base plate Assembly 2285632 Templates select kit 2285054 Refer to Section 2 4 Angio Cardio Neuro templates 2285056 containing 2185979 2127792 an...

Страница 138: ...ar Gantry Baseplate and Table 1 pc Doc 2229297 100 LCA LCV LC System Baseplate and Omega IV V EP Table Floor Preparation 1 pc Doc 2290880 2 100 Innova Pre Installation Kit Install Procedure 1 pc NOTE...

Страница 139: ...Dowel 2290937 2 Wood Dowel 16 mm diameter 6 pc Bolt Hex 2296892 Through bolt M20 500 400 6 pc Washer Flat 99142204 Washer plain 21 mm 40 mm for Through Bolts one for each bolt 6 pc Plate 2290941 Speci...

Страница 140: ...ame Part Description Quan Notes Floor Anchor 46 302265P1 Floor Anchor Bolt 5 8 10x6 16 mm drilling 16 mm drilling 12 anchors for LC Positioner and 4 anchors for Table 16 pc Above Grade anchor mounting...

Страница 141: ...thod hardware Washer Flat 99142204 Special Flat Washer for Through Bolts one for each bolt 16 pc same as above Plate 2290941 Special Steel Spacer Plate 4 in x 4 in 102 mm x 102 mm one for each bolt 16...

Страница 142: ...ositioner and 4 anchors for Table 16 pc On Grade anchor mounting method hardware Grout assy 2285055 10 kg Powdered Mortar Ardex K 15 RTV Silicon Rubber Adhesive 18 mm making tape adhesive Open cell fo...

Страница 143: ...or LC Positioner and 4 anchors for Table 16 pc Above Grade anchor mounting method hardware Grout assy 2285055 10 kg Powdered Mortar Ardex K 15 RTV Silicon Rubber Adhesive 18 mm making tape adhesive Op...

Страница 144: ...ach bolt 16 pc same as above Plate 2290941 Special Steel Spacer Plate 4 in x 4 in 102 mm x 102 mm one for each bolt 16 pc same as above Nut Hex 99141607 Hex Nut M20 STL galvanized two for each bolt 32...

Страница 145: ...ex Screws 2360523 Screw M16x30x30 Inox A4 80 Pass 12 pc For floor plate Base plate assembly Washer 99125091 Washer P 17 mm 40 mm 34 pc 24 are used for the positioner integration Hex Screws 99133570 Sc...

Страница 146: ...Notes 2185979 LC Positioner and Omega C N Patient Table floor mounting template 1 pc See Illustration 5 33 2127792 LCV Gantry and Omega A Patient Table floor mounting template 1 pc A C N Templates 23...

Страница 147: ...exceeding 5 kg 11 lbs at 100 mm 0 33 ft i e IV pole with its accessories pressure head is authorized on the same table accessory rail as the injector Never install injector and radiation protection o...

Страница 148: ...ova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 This page left intentionally blank 148 2 Mounting Requireme...

Страница 149: ...1EN Revision 1 Chapter 6 Electrical Connections 1 Power Distribution Illustration 6 1 AC Interconnect without Fluoro UPS NOTE All short AC power cable less than 3 meters between peripherals and respec...

Страница 150: ...UPS see table below and configuring the PDB in bypass mode 2 GEHC is responsible for powering on the system with the UPS in bypass mode 3 GEDE is responsible for UPS commissioning Table 6 1 A and B ca...

Страница 151: ...1EN Revision 1 NOTE The PDB shall include the switch allowing the commutation of generator supply to the UPS Neutral shall be fed by the hospital The customer provides the cables A and B NOTE Refer to...

Страница 152: ...V 60 Hz is certified to UL 508 and CSA C22 2 N 14 North America Second configuration 380 400 415 V 50 60 Hz is certified to EN 60439 1 and is CE marked not certified for Japan and China Please check...

Страница 153: ...ystem Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 It is recommended to separate the two power supply cables from the other cables 2 2 Typical PDB Europe CE Typical PDB Eur...

Страница 154: ...100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 3 CE PDB 1 2 154 2 Recommended Power Distribution...

Страница 155: ...va 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 4 CE PDB 2 2 Chapter 6 Electrical Connections...

Страница 156: ...100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 5 System Power Block Diagram 156 2 Recommended Power Dist...

Страница 157: ...100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 6 Detail Of General Power Supply C1 Power Terminal Connection Chapter...

Страница 158: ...100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 2 3 Typical US PDB Illustration 6 7 PDB UL layout 1 2 158 2 Recommended Power...

Страница 159: ...100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 8 PDB UL layout 2 2 Chapter 6 Electrical Connecti...

Страница 160: ...0 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 9 PDB UL Electrical Schematic 1 2 160 2 Recommended Power D...

Страница 161: ...3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 10 PDB UL Electrical Schematic 2 2 Chapter 6 Electrical...

Страница 162: ...configuration only The EMI filter box shall be installed on the sites with fluoro UPS CE The EMI Filter Box will be delivered as a single product not part of Fluoro UPS or PDB by GE Consumer Industri...

Страница 163: ...nding system is recommended for meeting patient safety requirements Reference For general system grounding requirements and information on establishing an equipotential grounding system refer to Groun...

Страница 164: ...0 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 12 Grounding Interconnect Without Fluoro UPS 164 3...

Страница 165: ...3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 13 Grounding Interconnect With Fluoro UPS Chapter 6 Electric...

Страница 166: ...ements for power supply cables provided by the customer The customer shall provide the power supply cables between the main transformer and the system between the transformer and the PDB Power Distrib...

Страница 167: ...hall be kept separated from room system cables Power supply and ground cables must be connected to the same distribution panel They must run near one to the other Power supply and ground cables provid...

Страница 168: ...on 5 1 Wiring Diagram The connection cables between the IVUS Control Room and Procedures Room components run in a dedicated under floor conduit see Section 5 2 A GND wire between the C1 cabinet and th...

Страница 169: ...able in the Procedures Room Locate the Procedures Room exit of the conduit close to the centerline of the Patient Table Locate it as close to the Patient Table base as possible considering Room for ac...

Страница 170: ...d 1 IVUS Joystick 806380001 ECG cable in case if NON Mac Lab ECG will be installed NOTE For the ground cable see the IVUS service manual for special instructions concerning cable running and cutting N...

Страница 171: ...ues See table below Line Voltage Fuse value 100 VAC 8 A 120 VAC 6 3 A 230 VAC 3 15 A Frequency 50 60 Hertz The country specific power cords are pre selectable in the GTC The IVUS will be connected to...

Страница 172: ...ve by low voltage relay 24 V In the Exam Room visible from any place in the room Acting during X ray exposures room light limited to 24 Vac maxi wires sized to 10 Amps maxi controls an external relay...

Страница 173: ...Q 3100 3100 IQ and 4100 4100 IQ has the ability to control an external relay that applies power to the room light dry contacts The relay is to be provided by the hospital or contractor The wire size t...

Страница 174: ...vided by the control room control panel The speaker must be installed in the exam room out of the patient vicinity to give easy access to the FE for maintenance operations and to medical staff to adju...

Страница 175: ...erlocks It is the responsibility of the field service to check that this requirement is not in contradiction with local regulation In case of conflict follow local regulation No other measures employe...

Страница 176: ...ply the system in record mode Such an UPS will provide to the customer about 10 minutes of autonomy Contact your local GEMS representative for more information and or public power distribution analysi...

Страница 177: ...ad positioner cabinet but it is highly recommended to connect it to a wall outlet fed by the main disconnect room device 11 2 Pedestal Injector A power cord is supplied with the injector In all cases...

Страница 178: ...power cord is supplied with Advantage Windows It is connected to outlet fed by the main disconnect room device Verify that the ground between AW AW spliter and monitors ground are equipotential 0 1 oh...

Страница 179: ...al GE Healthcare Direction 5314528 2 1EN Revision 1 13 MAC LAB System EX The best location for a MAC LAB Acquisition Unit Floor mount kit 408431 001 isn t defined yet For MAC LAB System EX refer to Ma...

Страница 180: ...terconnect maps and connection details refer to the following Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ MIS Map Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ MIS Charts General Guidelines Innova System intr...

Страница 181: ...of additional cables being added later as the system is developed and options are added The use of conduit is recommended for cables running overhead between rooms especially when a diagonal run prov...

Страница 182: ...mounting bracket Floor mount installation can be accomplished one of two ways Connectors mounted in trough under mounting bracket Figure 1 Connectors mounted above mounting bracket Figure 2 Illustrat...

Страница 183: ...IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 18 Cable Channeling Layout Chapter 6 Electrical Conn...

Страница 184: ...Q 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 16 Physical Runs 16 1 Physical Run Synoptic Illustration 6 19 184 16...

Страница 185: ...to connector when you look at the cable level For a description of how to use the following cable group schematics see below Illustration 6 20 Cable length data is as follows Cable Length the total c...

Страница 186: ...3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 21 Cable Group 1 From Technical Area To Exam Room 186 16...

Страница 187: ...IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 22 Cable Group 2 From Technical Area to Control Room Chapter 6 El...

Страница 188: ...00 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 23 Cable Group 3 From Technical Area to Technical Area C1 To C2...

Страница 189: ...5314528 2 1EN Revision 1 Illustration 6 24 Cable Group 4 Suspension are always pre cabled with 24 meter cables of connector to connector Monitor options includes their 24 meters length for cabling Ext...

Страница 190: ...100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 25 Cable Group 4 with LCD Suspension 190 16 Physi...

Страница 191: ...0 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 26 UPS Option Cable Set Chapter 6 Electrical Connec...

Страница 192: ...513A 2250247 2464 300 7 CEI 320 HBL4570C plug 38 6 27514A 5139188 2789 30 7 3 DB 26 pin 41 2 27675A 2361531 Type CL2 150 8 2 Pre stripping 8 2 27567A 2337165 2464 300 9 9 DB 15 pin 41 9 27660A 2258294...

Страница 193: ...00 8 1 DB 9 pin 34 4 27687A 2264834 1354 30 6 BNC 75 ohms 14 4 27688A 2264834 1354 30 6 BNC 75 ohms 14 4 27689A 2264834 1354 30 6 BNC 75 ohms 14 4 27690A 2264834 1354 30 6 BNC 75 ohms 14 4 27691A 2264...

Страница 194: ...5191 7 30V VGA 28048 2385192 7 30V VGA 28049 2385191 6 30V VGA 28050 2385192 6 30V VGA 28066 2385193 7 1354 30V BNC 14 4 28067 2385194 7 1354 30V BNC 14 4 28068 2385193 8 1354 30V BNC 14 4 28069 23851...

Страница 195: ...Engineer s toolkit 1 17 2 2 Required Conditions Condition Reference Effectivity The PDB is already installed Power cables are as follows 1 From PDB to UPS rectifier input 4x6 AWG recommended 4x3 AWG...

Страница 196: ...e provided to monitor voltages less than 85 loss of a phase or incorrect phase sequence Corrections to the phase sequence must be corrected only at the line side of the main circuit breaker CB1 1 Conn...

Страница 197: ...aging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Illustration 6 29 17 3 2 Connection of the Fluoro UPS Option Cables 1 Connect the Fluoro UPS power cables a Remove...

Страница 198: ...on 6 30 b Remove the protection panel Illustration 6 30 c Remove the metallic window from the protection panel Illustration 6 30 d The power cable shall enter the UPS by the bottom right hand side ent...

Страница 199: ...ustration 6 31 iii Drill a hole in the bottom cover plate for cable access RISK OF ELECTRIC SHOCK HIGH VOLTAGE PRESENT THE FLUORO UPS REQUIRES COMMON POWER INPUT FOR RECTIFIER AND BYPASS JUMPERS SHALL...

Страница 200: ...l Rectifier input phase 3 to X1 L3 1 terminal Rectifier ground to X1 PE rectifier terminal g Connect the Fluoro UPS output cable from PDB power block 2 as follows Illustration 6 32 Output load 1 to X1...

Страница 201: ...9 4 349 On pallet See Illustration 7 3 Omega Table Base Assembly 49 1 24 38 0 96 84 2 2 14 1 290 585 On pallet See Illustration 7 4 Omega Table Top Assembly 9 0 22 137 3 47 33 0 84 155 70 On pallet Se...

Страница 202: ...Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 1 2 Detail Of Innova Shipping Information 1 2 1 Innova LC Positioner Gantry On Shipping Dolly Ill...

Страница 203: ...3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 1 2 2 Innova LC Positioner Air Shipment Illustration 7 2 Chapter 7 Additiona...

Страница 204: ...100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 1 2 3 Innova C1 and C2 Cabinet on pallet Illustration 7 3 The shipping weight is of about...

Страница 205: ...0 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 1 2 4 Omega Shipment Illustration 7 4 Chapter 7 Additional Plannin...

Страница 206: ...IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 1 2 5 Omega Using Positioner Dollies Illustration 7 5 206 1 Shipping...

Страница 207: ...allation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 1 2 6 Tilt Table Shipment Illustration 7 6 1 2 7 Other Elements Package NOTE All OEM parts are shipped inside there original boxes grou...

Страница 208: ...Wrench Spanner 46 176584P1 High Voltage Cable Installation Innova LC Positioner Laptop Computer MS DOS Windows Positioner Configura tion and Calibration Status Display Same as for Innova LC Service En...

Страница 209: ...ion Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Table 7 2 cont d PRODUCT OR COMPONENT TOOL OR TEST EQUIPMENT USED FOR SOURCE RECEIVED DATE Monitor Suspension Phillips Flathead screwdriver...

Страница 210: ...n circles refer to Route Survey data The Route Survey is a form on which site data are listed see Section 3 2 Illustration 7 8 3 2 Step Two Survey Data concerning the intended delivery route are recor...

Страница 211: ...Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 Table 7 3 Ref no Area loading dock doorway hallway turn elevator obstruction etc Limitations loading capacity height width dep...

Страница 212: ...omponents like cables stationary rails etc are length selectable This selection should reflect the particularities encountered by an Installation Specialist on Site All cable and component selections...

Страница 213: ...ts may be red lined if red lining is allowed by local code Seismic requirements are identified on construction drawings X 2 Delivery route to installation or storage area meets requirements and has be...

Страница 214: ...tallation areas X 9 Mechanical supplier has been provided with a set of equipment installation drawings for reference For California permitted construction drawings or PMI specified installation drawi...

Страница 215: ...lect X Ray modality When prompted select the option for obtaining an IP address GEMSE Use the new mail form called INSFORM xls or INSFORM txt for obtaining an IP Address If you have questions or need...

Страница 216: ...ova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 This page left intentionally blank 216 1 IP Addressing Proc...

Страница 217: ...untry agency Seismic calculations per California Building Code applicable to the product can be found at the following address http gehcseismic com docs index cardiac_vascular htm Please contact your...

Страница 218: ...Innova 2100 IQ 3100 3100 IQ 4100 4100 IQ Cardiovascular Imaging System Pre Installation Manual GE Healthcare Direction 5314528 2 1EN Revision 1 This page left intentionally blank 218 1 Server Access...

Страница 219: ......

Страница 220: ...2008 General Electric Company GE Medical Systems a General Electric Company going to market as GE Healthcare 283 rue de la Mini re 78530 Buc FRANCE www gehealthcare com...

Отзывы: