![GE Innova 2100-IQ Скачать руководство пользователя страница 116](http://html1.mh-extra.com/html/ge/innova-2100-iq/innova-2100-iq_preinstallation-manual_4332925116.webp)
Innova 2100-IQ, 3100/3100-IQ, 4100/4100-IQ Cardiovascular Imaging System Pre-Installation Manual
GE Healthcare
Direction 5314528-2-1EN, Revision 1
Illustration 5-19: Detector Chiller Thermo-Con - Orientation
Illustration 5-20: Fluoro UPS UL Layout (Optional)
The left, right or back side of the UPS cabinet can be positioned against the wall.
The front side of the UPS cabinet must be accessible for maintenance operation.
Clearance around the front should be sufficient to enable free passage of personnel with the
door fully opened.
Recommended minimum clearance between ceiling and top of the UPS should be 400 mm
(16”) for proper cooling air exhaust.
116
1 Dimension Drawings
Содержание Innova 2100-IQ
Страница 219: ......