Illustration 6-2: AC Interconnect with Fluoro UPS
NOTE:
Contractor responsibility:
1. Electrical contractor is responsible for providing and connecting cables from the PDB
to the UPS (see table below) and configuring the PDB in bypass mode.
2. GEHC is responsible for powering on the system with the UPS in bypass mode.
3. GEDE is responsible for UPS commissioning.
Table 6-1: A and B cables specification
Cable
UPS CE version
UPS UL version
Recommended (Note (1))
Max
Recommended (Note
(2))
A
5 X 10 mm2
3 ph + N + PE
5 X 3 AWG
5 X 6 AWG
3 ph + N + PE
B
5 X 10 mm2
3 ph + N + PE
5 X 3 AWG
5 X 8 AWG
3 ph + N + PE
Note: (1) According to local requirement.
Note: (2) According to local requirement and cable type.