GE M
EDICAL
S
YSTEMS
D
IRECTION
2317229, R
EVISION
3
LOGIQ™ 180 B
ASIC
S
ERVICE
M
ANUAL
Chapter 4 Functional Checks
4 - 3
4-2-1-2
Power Up
1.) Connect the Power cable to an appropriate mains power outlet
2.) Press Front Panel
ON/OFF
key once to Switch ON/OFF
When power is applied to the Scanner, Power is distributed to the Fan, Control panel, Monitor, Internal
and External I/O’s, Boards & Peripherals. Back End Processor starts and its software code is distributed
to initiate the scanner.
Power Up Display Comes Up. Refer figure
4-2-1-3
Power Shutdown
1.) Switch OFF the
ON/OFF
at the Front of the system.
2.) Disconnect the Mains Power Cable if needed.
Figure 4-27 Mains Circuit Breaker and Mains Power Cable
Figure 4-28 ON/OFF key on Front Panel
Mains Power
Cable Connector
Main Circuit Breaker
Power On/Off Switch
Содержание H41542LA
Страница 2: ......
Страница 5: ...GE MEDICAL SYSTEMS DIRECTION 2317229 REVISION 3 LOGIQ 180 BASIC SERVICE MANUAL ii iii ...
Страница 160: ...GE MEDICAL SYSTEMS DIRECTION 2317229 REVISION 3 LOGIQ 180 BASIC SERVICE MANUAL 2 Index ...
Страница 161: ......