Cable cover
1.
Lift up the cable cover at the rear of the machine.
AC.24.336
2.
Connect the gas pipelines to the pipeline inlets. Use straps to
bundle the pipelines and electrical cable.
AC.24.337
3.
Insert the hook on the cover into the grooves, and push down
the cover to lock it.
AC.24.338
8 Setup and connections
2076152-001
8-31
Содержание Carestation 620
Страница 1: ...Carestation 620 650 650c A1 User s Reference Manual Software Revision 01...
Страница 12: ...Carestation 620 650 650c A1 x 2076152 001...
Страница 57: ...3 Push the ComWheel or select the quick key to confirm the change 2 System controls and menus 2076152 001 2 23...
Страница 58: ...2 24 2076152 001...
Страница 98: ...3 40 2076152 001...
Страница 102: ...4 4 2076152 001...
Страница 128: ...6 12 2076152 001...
Страница 150: ...7 22 2076152 001...
Страница 178: ...4 Tighten all thumb screws on the rear of the mounting plate AC 24 265 Carestation 620 650 650c A1 8 28 2076152 001...
Страница 182: ...8 32 2076152 001...
Страница 190: ...12 Calibrate the new O2 cell according to the Circuit O2 cell procedure Carestation 620 650 650c A1 9 8 2076152 001...
Страница 196: ...9 14 2076152 001...
Страница 246: ...11 44 2076152 001...
Страница 250: ...3 Set the cost for each agent 4 Select Back to return to the Gas Usage menu Carestation 620 650 650c A1 12 4 2076152 001...
Страница 268: ...Carestation 620 650 650c A1 User s Reference Manual English 2076152 001 2021 05 Rev S...