8.1.
SETPOINTS OF THE DIFFERENTIAL PROTECTION.
In each phase (A, B, C) there are two setpoints that must be accomplished
1.
The value of K
: If there is no high resistance consideration of loop or other, the value that it must of be
adopted is that of K = 0.8. With this have a sensibility of 0.33 In.
2.
The value of the supervision circuit
:
•
Value of the minimal short circuit current is inferior to In. The adjustment will be the minimum possible. In
this way the sensibility will be determined by the value of K.
•
Value of the minimal short circuit current is sensibly superior to In. The value of the supervision current, it
is preferable to adjust it 1.5, to avoid the tripping of the protection in case of one of current circuits is
broken or short-circuited, and thus to give the alarm unit time to act and block the trips. Evidently, in this
last case the sensibility is determined by the supervision unit, but is earned in safety.
8.2.
SETPOINTS OF THE BREAKER FAILURE
•
Current level adjustment
: The minimum level should be at least 150% of the maximum nominal current.
Bear in mind that to calculate this value it must be considered the global ratio of the Substation or Power
•
Time setting
: This value must be inferior to the time set for zone 2 of the distance relays or of the
backup protections of the power transformers. The value must also be higher than the trip time of the
main protections (zone 1), plus the opening time of the associated breaker, plus a safety margin (i.e., if
zone 2 is set to 500 ms., the breaker failure will be adjusted in 300 ms - have assumed a tripping time of
distance relay in zone 1 of 30 ms. and a breaker time of 80 ms.).
8.3.
INSTALLATION
All the units must be mounted in vertical surface which allows access to the front and rear sides of the
equipment. It is not necessary to have access to the lateral surfaces of the equipment mounted.
8.4.
PREVIOUS CHECK
Check that the equipment has not suffered any damage during transportation and that its characteristics
and adjustments have not been altered
Check that the ratios of the auxiliary transformers are accurate according to the selected global ratio. (See
figures from 226B6429H1 to 226B6429H8)
Measure for each line and phase the total impedance of the loop on the 1 A side, from the protection input
leads, shorting the main transformer s secondary.
Check that the maximum value obtained in the measurements is less than:
Rmax < (2K/1-K) *RE
Where:
Rmax: Max. resistance measured
RE: Stabilization resistance (250
ÿ
)
K: Adjusted slope
Содержание BUS1000
Страница 6: ......
Страница 8: ......
Страница 27: ...5 HARDWARE DESCRIPTION GEK 98514B BUS1000 Busbar Protection 5 3 Figure 7 1 BBD RACK Figure 7 2 BTR RACK ...
Страница 28: ...5 HARDWARE DESCRIPTION 5 4 BUS1000 Busbar Protection GEK 98514B Figure 7 4 BAR RACK Figure 7 5 BFR RACK ...
Страница 34: ...5 HARDWARE DESCRIPTION 5 10 BUS1000 Busbar Protection GEK 98514B ...
Страница 36: ...6 RECEIVING HANDLING AND STORAGE 6 2 BUS1000 Busbar Protection GEK 98514B ...
Страница 54: ...8 FINAL INSTALLATION AND COMMISSIONING 8 4 BUS1000 Busbar Protection GEK 98514B ...
Страница 56: ...9 TESTS AND PERIODICAL MAINTENANCE 9 2 BUS1000 Busbar Protection GEK 98514B ...
Страница 57: ...10 FIGURES GEK 98514B BUS1000 Busbar Protection 10 1 10 10 10 10 FIGURES FIGURES FIGURES FIGURES ...
Страница 66: ...10 FIGURES 10 10 BUS1000 Busbar Protection GEK 98514B ...
Страница 70: ...11 DIMENSIONS 11 4 BUS1000 Busbar Protection GEK 98514B FIGURE 19 POWER SUPPLY OR THYRITE BOXES 226B2211F18 ...
Страница 71: ...11 DIMENSIONS GEK 98514B BUS1000 Busbar Protection 11 5 FIGURE 20 BREAKER BLOCK DIAGRAM 226B2211F23 ÿ ÿ ÿ ÿ ÿ ...
Страница 74: ...11 DIMENSIONS 11 8 BUS1000 Busbar Protection GEK 98514B FIGURE 23 CABINET 226B2211F21 ...
Страница 104: ...13 SCHEMATICS DOUBLE BUSBAR 13 16 BUS1000 Busbar Protection GEK 98514B ...
Страница 107: ...13 SCHEMATICS DOUBLE BUSBAR GEK 98514B BUS1000 Busbar Protection 13 19 16 TEST UNIT ZONES A B 226B6429F16 ...
Страница 121: ...13 SCHEMATICS DOUBLE BUSBAR GEK 98514B BUS1000 Busbar Protection 13 33 31 POWER SUPPLY AUXILIARY CIRCUITS 226B6429F31 ...
Страница 123: ...13 SCHEMATICS DOUBLE BUSBAR GEK 98514B BUS1000 Busbar Protection 13 35 43 SIGNALLING CONTACT OUTPUTS 226B6429F43 ...
Страница 124: ...13 SCHEMATICS DOUBLE BUSBAR 13 36 BUS1000 Busbar Protection GEK 98514B CABINETS INTERCONNECTIONS 226B6429F44 ...