—
47
—
●
Method of filling water
Draining Outlet for Service Purpose (with Rubber Plug)
(This outlet is only for discharging the water inside the
drainage groove)
⑥
Electrical Line Layout
●
All supplied components, materials and electrical operation must be in conformity with the local laws and regulations.
●
The power supply must be of rated voltage of the unit and special electrical line for air-conditioning.
●
For electrical operation, refer to the
“
Electrical Diagram
”
attached on the unit.
●
All installation of electric lines must be carried out by professional electricians.
●
A circuit breaker must be installed for the purpose of cutting off the power supply of the whole system when needed.
●
Grounding measures must be taken.
●
Carry out installation in accordance with the state line layout rules.
Drainage Pipe
Cover Plate of
Check Hole
Check Hole
above 100mm
Plastic Spray Can
(The pipe shall be around
100mm long)
(Fill water from the air outlet side)
Содержание AIR C18
Страница 2: ......
Страница 3: ......
Страница 5: ... 2 Model Remarks GE AIR C24 Communication Ceiling Mounted Unit 1PH 230V 50Hz R407C ...
Страница 14: ... 11 Applicable to GE AIR C24 OUT Unit mm Over 600 Bolt Nut Wrench ...
Страница 15: ... 12 Applicable to GE AIR C34 C41 OUT 378 Unit mm Over 600 Bolt Nut Wrench ...
Страница 17: ... 14 Electrical Diagram GE AIR C18 GE AIR C24 6 ...