Connection of Refrigerant Pipe
●
When connecting the pipe to the unit or disassemble the pipe from the unit, use the spanner and the torque
spanner at the same time as shown in the figure.
●
Refer to Table 1 for the torque needed for tightening the conical nut.
●
Apply refrigerant oil in and outside the conical nut during the connection. First manually screw 3 to 4 circles, and
then use the torque spanner to tighten it.
●
Refer to table 1 to decide the tightening torque (excess tightening may damage the nut so as to cause leakage).
●
Check if the connecting pipe has leakage, and then carry out thermal insulation as shown in the figure.
●
Only use middle sponge (11) to wrap the joint part between the gas pipe and the insulating sleeve
⑧
of the
collect gas pipe.
Table 1 :
Pipe
Dia.
Wall
Thickness
(
mm
)
Tightening
Torque
Explanation
φ
9.52
≥
0.71 30~40N.m
φ
16
≥
1 40~50N.m
φ
12
≥
1 60~65N.m
φ
19
≥
1 70~75N.m
The allowed maximum design length of connecting pipe of
air-conditioning unit is 25m (15m for 50 Series0
。
In case the
pipe is longer than 10m, add the following amount of
refrigerant for each extra meter :
GE AIR C18 Add 30g
GE AIR C24 Add 40g
GE AIR C34 Add 40g
GE AIR C41 Add 50g
Apply refrigerant oil here
Middle Sponge (Accessory) (11)
(Use gasket to wrap the pipeline joint)
Torque Spanner
Cable Bundle
④(×
4
)
Spanner
Pipeline Joint
Conical Nut
Insulating Sleeve
of
Liquid-entered Pipe
⑨
(For Liquid Pipe)
Insulating Sleeve
of
Collect Gas Pipe
⑧
(For Air Pipe)
Collect Gas Pipe
Liquid-entered Pipe
Содержание AIR C18
Страница 2: ......
Страница 3: ......
Страница 5: ... 2 Model Remarks GE AIR C24 Communication Ceiling Mounted Unit 1PH 230V 50Hz R407C ...
Страница 14: ... 11 Applicable to GE AIR C24 OUT Unit mm Over 600 Bolt Nut Wrench ...
Страница 15: ... 12 Applicable to GE AIR C34 C41 OUT 378 Unit mm Over 600 Bolt Nut Wrench ...
Страница 17: ... 14 Electrical Diagram GE AIR C18 GE AIR C24 6 ...