Chapter A8: Quality Assurance Process and Maintenance
Definium AMX 700 X-Ray System
5161515-1EN
Rev. 6 (10 February 2008)
A8-10
Operator Manual
© 2008 General Electric Company. All rights reserved.
13. Review the Status (far right column) of each test.
If all tests PASS: QAP is complete. Click [EXIT] to return to the Worklist screen and continue work.
(p. A8-10) for more information.
Figure A8-15
QAP Results screen
Failed QAP
In the event of failed QAP tests, wait 10 minutes and repeat the QAP procedure to confirm the failure.
Check the items listed below when repeating the tests:
• Check collimator blades. Make sure that they are fully open and not in the field of view.
• Check that the phantom is correctly positioned.
• Check that no other objects are in the field of view.
If a single failure is confirmed, call to schedule service. The system is operational, although inspection
and potential calibration are needed.
If multiple failures are confirmed, image quality may be affected; cease use of the unit and call for
immediate service.
FOR
TRAINING
PURPOSES
ONLY!
NOTE:
Once
downloaded,
this
document
is
UNCONTROLLED,
and
therefore
may
not
be
the
latest
revision.
Always
confirm
revision
status
against
a
validated
source
(ie
CDL).