
Page 6
LOCATION & PLACEMENT
When installing the boiler or heater, consideration must be given to proper location. In addition to the following
requirements, the installation must adhere to all local or state code requirements.
1. The unit should be leveled.
2. Minimum clearance for hot water pipes and venting from combustible material is 6 inches.
3. The boiler/heater must not be installed on carpeting or other combustible flooring.
4. The unit is for alcove installation on non-combustible floors only. The minimum clearance for
combustible material:
Minimum Clearance
A-035
A-050
A-070
A-097
A-120
A-140
Back & Side Walls
24
24
24
24
24
24
Top of Jacket to Ceiling
51
51
56
56
56
56
Dimensions in Inches
5. The heater/boiler must be installed so that it can be serviced without removing the heater/boiler or any
surrounding structure. The minimum space required in front of the boiler to allow removal of the burner
is:
Minimum Clearance
A-035
A-050
A-070
A-097
A-120
A-140
Burner Removal
23
28
32
35
35
35
Dimensions in Inches
6. A hot water boiler installed above radiation level must be provided with a low water cutoff device either
as a part of the boiler or at the time of boiler installation.
7. The boiler/heater shall be protected from freezing. Heat exchangers damaged by freezing shall not be
considered for warranty.
8. The unit must be located where condensation or leakage from the heat exchanger or connections can
be drained and will not result in damage to the adjacent area or to lower floors of the structure. If this
cannot be avoidable, use of an adequately drained catch pan is recommended. The pan must not
restrict combustion air flow to the burner.
9. The boiler/heater must be installed such that the gas ignition system and other electrical components
are protected from water (dripping, spraying, rain, etc.) during operation and service.
Maintain the area surrounding the heater/boiler clean and free of combustible
materials, gasoline, and other flammable liquids or vapors. The heater/boiler should
never be covered.
COMBUSTION AIR REQUIREMENTS
The boiler/heater room must be provided with
TWO
openings to assure adequate combustion air and proper
ventilation. One opening should be 6 to 12 inches above the floor and the other 6 to 12 inches below the ceiling,
preferably on opposite walls. The size of each opening will vary based on whether the air is taken from inside or
outside the building, and with the input rating of the boiler/heater.
The make-up air must be sized for the total BTU per hour demand of ALL gas fired or
air using appliances served by these openings.
Содержание A2-035
Страница 30: ...Page 29 DIAGRAMS...
Страница 31: ...Page 30...
Страница 33: ...Page 32 WIRING DIAGRAM A2000 Water Heater Models...
Страница 34: ...Page 33 WIRING DIAGRAM A2000 Boiler Models...
Страница 35: ...Page 34 WIRING DIAGRAM A2000 CSD 1 Boiler Models...
Страница 36: ...Page 35 A2000 WITH CONSTANT PUMP OPERATION A2000 WITH ON OFF PUMP OPERATION...
Страница 37: ...Page 36 A2000 WITH INFITEC PUMP DELAY...
Страница 38: ...Page 37 A2000 PARTS LIST 1 17 19 15 23 22 21 20 18 16 4 2 Gas Train Components Differ By Model 7 14 5...
Страница 44: ......