
Page 5
PRODUCT RECEIPT
On receipt of your heater/boiler, visually check for external damage to the appliance or shipping crate. If the
crate is damaged, make a note to that effect on the Bill of Lading before signing for the shipment. After
removing the appliance from the shipping crate, report any damage to the carrier immediately. If any items were
shipped loose, make sure they were received. All carrier claims are your responsibility.
All claims for damage or shortages must be filed with the carrier. Before product is returned, permission and an
Authorized Return Goods Number (RMA) must be acquired from the manufacturer. Product returned to the
factory without an authorized RMA will not be accepted. All returned product is subject to a restocking charge.
HIGH ELEVATION
For units installed at elevations above 2,000 feet over sea level, consult the factory for the proper burner
orifices.
Units installed at elevations above 2,000 feet must be de-rated to account for the
lower percentage of oxygen present in the air. Personal injury due to the inhalation
of Carbon Monoxide may result if the unit input is not properly de-rated.
INSTALLATION CODE REQUIREMENTS
1. The installation of the unit must conform to the requirements of the authority having jurisdiction or, in the
absence of such requirements, to the National Fuel Gas Code, ANSI, Z223.1 / NFPA 54, Latest Edition
and the National Electric Code (NEC) ANSI/NFPA 70.
2. Where required by authority having jurisdiction, the installation of water boilers must conform to
American Society of Mechanical Engineers Safety Code for Controls and Safety Devices for
Automatically Fired Boilers, No. CSD-1.
3. For Canada only, the installation must conform to CAN/CGA B149 and CSA C22.1 Part 1.
It is important to wear eye protection and gloves while installing, servicing or
repairing the unit. A dust respirator is recommended while servicing or repairing the
burner assembly or combustion chamber area. Use caution when working on roofs
and/or scaffolding. Proper and safe scaffolding and/or ladders must be used and all ladders should be
secured when in use. Check overhead for antennas, power lines and other obstacles before erecting
ladders or scaffolding and while working on any roof structure.
This manual must be thoroughly reviewed and understood before installing your A2000
heater/boiler. Installation and Service must be completed by a Qualified Installer, Service
Agency or Qualified Gas Supplier. If you have any questions which are not covered in the
manual, please contact Green Boiler Technologies or your local representative.
INSTALLATION
Содержание A2-035
Страница 30: ...Page 29 DIAGRAMS...
Страница 31: ...Page 30...
Страница 33: ...Page 32 WIRING DIAGRAM A2000 Water Heater Models...
Страница 34: ...Page 33 WIRING DIAGRAM A2000 Boiler Models...
Страница 35: ...Page 34 WIRING DIAGRAM A2000 CSD 1 Boiler Models...
Страница 36: ...Page 35 A2000 WITH CONSTANT PUMP OPERATION A2000 WITH ON OFF PUMP OPERATION...
Страница 37: ...Page 36 A2000 WITH INFITEC PUMP DELAY...
Страница 38: ...Page 37 A2000 PARTS LIST 1 17 19 15 23 22 21 20 18 16 4 2 Gas Train Components Differ By Model 7 14 5...
Страница 44: ......