
CMM USER'S MANUAL (E2.51)
24
6.
Tighten the pipe connectors gently but firmly by hand, be
careful that you do not cause any forces
on the glass tube.
Insert the tube in place. The filter inside the tube is off the bath side, towards
the front panel of the test gas generator. Nuts of the fittings should be parallel to U-pipe.
7.
Press the tube in place, in line the connector nuts with the pack plate (Figures 13. - 15.)
Note that
if no alignment has been made, the glass tube can break and mercury has access to the test gas
generator (
Figure 12
. and
Figure 16
.).
8.
Run the points 1-4 in the reverse order.
Figure 14. Correctly aligned
connector nuts
Figure 12. Incorrectly
connector nuts
Figure 15. Correctly aligned connector nuts
Figure 16. Incorrectly aligned connector nuts
Figure 13. Correctly
aligned connector nuts