MDE-4813D CFN PLUS Installation Manual · February 2018
41
3.
Attach to each support hole in the rear panel a wall bracket (see, 2 in
), with nut,
M8 x 20 screw and flat washer (3/4/5 in
). Set the bracket so that they fit to the
proper installation, as shown in
. The wall bracket dimensions are provided in
4.
Set the CFN PLUS enclosure (with wall brackets) in the spot and mark the four holes
locations from brackets for drilling. Select a place that allows you to open completely the
CFN PLUS door.
5.
Drill four holes in the installation spot (fit for M4 screws).
6.
Insert four wall anchors (or equivalent) in the holes.
7.
Set the CFN PLUS enclosure on the spot so that its installation holes fit with the anchors.
8.
Insert four M4 screws (6 in
) and secure CFN
PLUS enclosure. Verify that CFN PLUS enclosure is firmly held, and provides a distance
from wall.
9.
Take care that all power and communication cables pass through the holes in the bottom
panel.
Figure 3-5 Rear Panel Support Holes
Figure 3-6 Wall Bracket, Installation Example
Содержание 800938653
Страница 33: ...MDE 4813D CFN PLUS Installation Manual February 2018 23 Figure 2 3 Conduits Layout for Mechanical Pump...
Страница 34: ...MDE 4813D CFN PLUS Installation Manual February 2018 24 Figure 2 4 Conduits Layout for Electronic Pump...
Страница 65: ...MDE 4813D CFN PLUS Installation Manual February 2018 55 Figure 3 18 CFN PLUS Terminal Block Wiring List Label...
Страница 80: ...MDE 4813D CFN PLUS Installation Manual February 2018 70 This page is intentionally left blank...
Страница 88: ...MDE 4813D CFN PLUS Installation Manual February 2018 78 Figure B 1 CFN PLUS Wiring Diagram Mechanical Pump...
Страница 89: ...MDE 4813D CFN PLUS Installation Manual February 2018 79 Figure B 2 CFN PLUS Wiring Diagram Electronic Pump...
Страница 90: ...MDE 4813D CFN PLUS Installation Manual February 2018 80 This page is intentionally left blank...