MDE-4813D CFN PLUS Installation Manual · February 2018
17
S
S
E
E
C
C
T
T
I
I
O
O
N
N
2
2
P
P
R
R
E
E
L
L
I
I
M
M
I
I
N
N
A
A
R
R
Y
Y
I
I
N
N
S
S
T
T
A
A
L
L
L
L
A
A
T
T
I
I
O
O
N
N
P
P
R
R
O
O
C
C
E
E
D
D
U
U
R
R
E
E
S
S
2
2
-
-
1
1
.
.
G
G
E
E
N
N
E
E
R
R
A
A
L
L
This section provides the general installation procedures for the CFN PLUS.
These procedures include:
•
Preliminary instructions
•
Wiring and Wire Conduits requirements
2
2
-
-
2
2
.
.
I
I
N
N
S
S
T
T
A
A
L
L
L
L
A
A
T
T
I
I
O
O
N
N
S
S
P
P
E
E
C
C
I
I
F
F
I
I
C
C
A
A
T
T
I
I
O
O
N
N
S
S
2-2.1. General
N
N
O
O
T
T
E
E
Perform a site survey of the station prior to
installation.
Installation procedures and requirements depend, to some extent, on the specific fuel dispenser
models and the site layout. Therefore, use the information in this section to develop installation
plans for each specific installation. Since installation requirements vary widely from case to case,
no installation hardware is supplied by the equipment manufacturer, and installation planners must
develop their own requirements.
The customer should provide an installation plan, designed by an authorized engineer, and
applicable to all authorities having jurisdiction. This plan design should reflect the existing electric
infrastructure of the site.
2-2.2. Precautions and Safety Notes
Prior to actual installation activities, carefully observe the precautions and safety notes below.
W
W
A
A
R
R
N
N
I
I
N
N
G
G
Before installing or servicing equipment, carefully
observe the warnings and precautions provided at
the beginning of this manual.
Remember that the Home Base Gas Station environment is highly flammable and
combustible. Therefore, make sure that actual installation is performed by experienced
personnel, licensed to perform work in Home Base Station and capable of implementing all
applicable requirements of the National Fire Protection Association (NFPA) 30
Содержание 800938653
Страница 33: ...MDE 4813D CFN PLUS Installation Manual February 2018 23 Figure 2 3 Conduits Layout for Mechanical Pump...
Страница 34: ...MDE 4813D CFN PLUS Installation Manual February 2018 24 Figure 2 4 Conduits Layout for Electronic Pump...
Страница 65: ...MDE 4813D CFN PLUS Installation Manual February 2018 55 Figure 3 18 CFN PLUS Terminal Block Wiring List Label...
Страница 80: ...MDE 4813D CFN PLUS Installation Manual February 2018 70 This page is intentionally left blank...
Страница 88: ...MDE 4813D CFN PLUS Installation Manual February 2018 78 Figure B 1 CFN PLUS Wiring Diagram Mechanical Pump...
Страница 89: ...MDE 4813D CFN PLUS Installation Manual February 2018 79 Figure B 2 CFN PLUS Wiring Diagram Electronic Pump...
Страница 90: ...MDE 4813D CFN PLUS Installation Manual February 2018 80 This page is intentionally left blank...