MDE-4813D CFN PLUS Installation Manual · February 2018
35
3
3
-
-
3
3
.
.
H
H
O
O
M
M
E
E
B
B
A
A
S
S
E
E
S
S
T
T
A
A
T
T
I
I
O
O
N
N
-
-
O
O
V
V
E
E
R
R
V
V
I
I
E
E
W
W
3-3.1. General
Prior to installation, you are required to obtain an overview of the Home Base Station functional
architecture. This overview is required in order to draw an architecture diagram with all
components and their communication links.
shows a functional diagram of the links within the Home Base Station with mechanical
pumps.
shows a functional diagram of the links when operating with electronic pumps.
3-3.2. Home Base Station Architecture
The Home Base Station functional architecture consists of the following levels:
•
Main Power Cabinet and Home Base Station forecourt
•
Head Office Center
3-3.2.1. Main Power Cabinet
The Main Power Cabinet includes the following components:
•
Mains Circuit Control Box (MCC)
•
Uninterruptible Power Supply (UPS)
•
Power Distribution Box (PDB)
•
TLG Controller
3-3.2.2. Home Base Forecourt
The Home Base Forecourt includes the following components:
•
CFN PLUS
•
Dispenser(s) - up to four mechanical nozzles for each CFN PLUS. For UL
listing, this product has only been evaluated for use with UL Listed Dispensers.
•
One or more Underground gas tanks
•
TLG probe for each gas tank. For UL listing, this product has only been
evaluated for use with UL-listed TLGs.
3-3.2.3. Head Office System (Optional)
The Head Office system consists of fully integrated management hardware and software tool that
supports Home Base Station and small gas stations with their sale management of products
including inventory management and reporting.
The Head Office Center is a remote-control center that stores, processes and analyzes all the
transactions at the Home Base Station. The Head Office Station provides an integrated retail
solution.
Содержание 800938653
Страница 33: ...MDE 4813D CFN PLUS Installation Manual February 2018 23 Figure 2 3 Conduits Layout for Mechanical Pump...
Страница 34: ...MDE 4813D CFN PLUS Installation Manual February 2018 24 Figure 2 4 Conduits Layout for Electronic Pump...
Страница 65: ...MDE 4813D CFN PLUS Installation Manual February 2018 55 Figure 3 18 CFN PLUS Terminal Block Wiring List Label...
Страница 80: ...MDE 4813D CFN PLUS Installation Manual February 2018 70 This page is intentionally left blank...
Страница 88: ...MDE 4813D CFN PLUS Installation Manual February 2018 78 Figure B 1 CFN PLUS Wiring Diagram Mechanical Pump...
Страница 89: ...MDE 4813D CFN PLUS Installation Manual February 2018 79 Figure B 2 CFN PLUS Wiring Diagram Electronic Pump...
Страница 90: ...MDE 4813D CFN PLUS Installation Manual February 2018 80 This page is intentionally left blank...