MDE-4813D CFN PLUS Installation Manual
·
February 2018
76
G. Tanks
Is tank gauge reading required
Yes
No
How many tanks and what type? _______________________________________
Do they use a TLS, what type? _________________________________________
How do they read tanks today? _________________________________________
H. Site inspection
(draw the station and attach photos):
Pay attention to the following:
•
Photos of: Nozzle, Hose, Pump, Isle, Station
•
Distances
•
Location of office (to install FCC), Pumps, Tanks, Isles etc.
•
Broadcast antennas, Power line cables/tower, Generators etc.
Содержание 800938653
Страница 33: ...MDE 4813D CFN PLUS Installation Manual February 2018 23 Figure 2 3 Conduits Layout for Mechanical Pump...
Страница 34: ...MDE 4813D CFN PLUS Installation Manual February 2018 24 Figure 2 4 Conduits Layout for Electronic Pump...
Страница 65: ...MDE 4813D CFN PLUS Installation Manual February 2018 55 Figure 3 18 CFN PLUS Terminal Block Wiring List Label...
Страница 80: ...MDE 4813D CFN PLUS Installation Manual February 2018 70 This page is intentionally left blank...
Страница 88: ...MDE 4813D CFN PLUS Installation Manual February 2018 78 Figure B 1 CFN PLUS Wiring Diagram Mechanical Pump...
Страница 89: ...MDE 4813D CFN PLUS Installation Manual February 2018 79 Figure B 2 CFN PLUS Wiring Diagram Electronic Pump...
Страница 90: ...MDE 4813D CFN PLUS Installation Manual February 2018 80 This page is intentionally left blank...