NOTE
All units, even a single charging station, must be tied to
a group. The workflow of adding units must follow the
connectivity and the DLM structural paths. Always start
with the unit that will act as the internet gateway
followed by the closest units of the different levels. If
more units are installed and shall work together in a
DLM system, all must belong to the same communication
group structure.
Crown icon = DLM master (Manage group load balancing)
Internet icon = Internet gateway/group (Internet master, communication master (manage
communication groups), acting master to a mesh Wi-Fi network, "first node" in a “Wi-Fi-mesh”).
Version: 1.3
73
Содержание ENTITY PRO
Страница 1: ...1 3 GAROEntityProinstallationand operation GARO Entity Pro installation and operation Version 1 3...
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 18: ......
Страница 32: ...a TN system b TN C PE L2 PE L1 L2 L3 N PE L1 L2 L3 N PE L1 L2 L3 N PE L1 L2 L3 N 32 Version 1 3 Installation...
Страница 48: ...100A LI 1 LI 2 48 Version 1 3 Installation...
Страница 100: ......
Страница 101: ...EU DECLARATION OF CONFORMITY Version 1 3 101 EU Declaration of conformity...
Страница 102: ...102 Version 1 3 EU Declaration of conformity...