17. Turn the power/voltage on.
18. The light indicator on the front panel turns red at
power/voltage up. Make sure that the indicator
light on the load interface turns green. This can take
60–90 seconds.
The last few seconds before turning green, the light
turns blue. This is to indicate that the firmware starts
operating correctly. However, the most important
step is the green light.
NOTE
If the light indicator on the power unit does not turn
green within 90 seconds of powering up the power unit,
refer to
.
19. Download the GARO Connect app on AppStore or
Google Play store.
Long
O OFF
O OFF
O OFF
O OFF
> 90 sec
< 90 sec
> 90 sec
10:06
Version: 1.3
55
Содержание ENTITY PRO
Страница 1: ...1 3 GAROEntityProinstallationand operation GARO Entity Pro installation and operation Version 1 3...
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 18: ......
Страница 32: ...a TN system b TN C PE L2 PE L1 L2 L3 N PE L1 L2 L3 N PE L1 L2 L3 N PE L1 L2 L3 N 32 Version 1 3 Installation...
Страница 48: ...100A LI 1 LI 2 48 Version 1 3 Installation...
Страница 100: ......
Страница 101: ...EU DECLARATION OF CONFORMITY Version 1 3 101 EU Declaration of conformity...
Страница 102: ...102 Version 1 3 EU Declaration of conformity...