c. IT system.
2. Install the wires to the terminal block.
a. If the wires have strained conductors (A), use a
TX20 screwdriver and push the orange button to
open the terminal.
b. If the wires have cable ferrules (B) or solid
conductors (C), push the wires into the terminal.
3. To remove any wire, push a TX20 screwdriver on
the terminal and pull the wire out.
4.12.6
TO INSTALL A SECOND POWER CABLE
(DAISY-CHAINING METHOD)
If several charging stations are fed by the same power
cable in a daisy chain, a second power cable can also
be connected to the terminal.
1. Dismantle the second power cable for installation.
Refer to
4.12.4 To prepare the power cable for
2. Install the wires of the second power cable to the
terminal. For more information about installation
types, refer to
4.12.5 To connect the power cable
.
4.12.7
TO PREPARE THE INSTALLATION BRACKET
WITH AN ETHERNET CABLE
If ethernet should be used, the installation bracket must
be prepared with the ethernet cable.
1. Thread the ethernet cable through the installation
bracket.
PE
18 mm
18 mm
A
B
C
TX20
18 mm
TX20
Version: 1.3
33
Содержание ENTITY PRO
Страница 1: ...1 3 GAROEntityProinstallationand operation GARO Entity Pro installation and operation Version 1 3...
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 18: ......
Страница 32: ...a TN system b TN C PE L2 PE L1 L2 L3 N PE L1 L2 L3 N PE L1 L2 L3 N PE L1 L2 L3 N 32 Version 1 3 Installation...
Страница 48: ...100A LI 1 LI 2 48 Version 1 3 Installation...
Страница 100: ......
Страница 101: ...EU DECLARATION OF CONFORMITY Version 1 3 101 EU Declaration of conformity...
Страница 102: ...102 Version 1 3 EU Declaration of conformity...