5. Set the charging station to state B (shown with a
blue solid light indication).
6. Set the charging station to state C. Shown with a
blue pulsating light indication.
7. Do a check of the voltage in the Type 2 outlet.
8. Press the test button (T) on the charging unit for
approximately 1 second but not more than 5
seconds. Make sure that the all-pole circuit breaker
is triggered.
9. Reset the all-pole circuit breaker.
10. Do a test of the earth faults (AC and DC) with a test
instrument.
11. When needed, reset the all-pole circuit breaker.
12. Set the charging station to state A.
< 90
sec
T
42
Version: 1.3
Содержание ENTITY PRO
Страница 1: ...1 3 GAROEntityProinstallationand operation GARO Entity Pro installation and operation Version 1 3...
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 18: ......
Страница 32: ...a TN system b TN C PE L2 PE L1 L2 L3 N PE L1 L2 L3 N PE L1 L2 L3 N PE L1 L2 L3 N 32 Version 1 3 Installation...
Страница 48: ...100A LI 1 LI 2 48 Version 1 3 Installation...
Страница 100: ......
Страница 101: ...EU DECLARATION OF CONFORMITY Version 1 3 101 EU Declaration of conformity...
Страница 102: ...102 Version 1 3 EU Declaration of conformity...