manualshive.com logo in svg
background image

Part # 9229077 (07/05)

Page 9

INSTALLATION Continued

WARNING:  All connections must be sealed with a 
joint compound suitable for LP gas, and all connections 
must be tested with a soapy solution before lighting 
any pilots!

Initial Pilot Light

Initial pilot light is in the following sequence:
.  Turn  the  manual  shut-off  valve  on  the  incoming 

service line “OFF”

2.  Turn all burner valves “OFF”.
3.  Close all pilot adjusting screws (clockwise turn all 

the way in).

4.  Wait for any accumulated gas to disperse.
5.  Open the manual shut-off valve.
6.  Apply a lighted match or taper to a pilot burner and 

open that pilot’s adjustment screw gradually until 

the pilot lights.

7.  Adjust  the  pilot  flame  for  the  desired 

characteristics.

8.  Turn “ON” that main burner and watch to make 

sure it lights from the pilot, then turn the burner 

“OFF”.

9.  Repeat  steps  6  through  8  to  light  all  remaining 

pilots.

If only one pilot has gone out, it is not necessary to 

follow the entire procedure outlined above. Merely apply 

a lighted match or taper to the pilot until it lights, then 

adjust the pilot valve. If the pilot will not light, close 

the adjustment valve completely, do not use that burner, 

and call for service.
NOTE: It may be necessary to re-light the pilots several 

times until the new lines are purged of any trapped air 

and constant gas flow is attained.

Shut Down

.  Turn  top  burner  valves  clockwise  to  “OFF” 

position.

2.  When  shutting  down  for  periods  longer  than 

overnight,  turn  the  manual  ON/OFF  valve  on 

the  incoming  service  line  “OFF”.  Close  all  pilot 

adjusting screws (right-hand turn all the way in).

Final Preparation

New units are wiped clean with solvent at the factory 

to  remove  any  visible  signs  of  dirt,  oil,  grease,  etc., 

remaining from the manufacturing process. They should 

be washed with hot, soapy water to remove any solvent 

or oil residue or installation dust or debris before using 

for food preparation.

CLEANING AND MAINTENANCE

Any piece of equipment works better and lasts longer when 

maintained properly and kept clean. Cooking equipment 

is no exception. Your Garland Char-Broiler must be kept 

clean during the working day and thoroughly cleaned 

at the end of each day.

WARNING:  If gas odors are detected, the gas supply 
must be turned “OFF” at the main shut-off valve and 
the local gas company or authorized service agency 
contacted for service.

Daily-GXC  Series

.  Remove the broiler grates. Wire brush them clean 

of any encrusted materials and wash in hot, soapy 

water. A common cleaning practice is to turn grates 

upside-down  to  burn  off  encrusted  material.  Do 

not  do  this  with  the  char-broiler!  It  is  likely  that 

cooked on matter will cook in even deeper rather 

than burn off.

Содержание GXC24

Страница 1: ...d by a Garland authorized service agent using genuine Garland replacement parts Garland will have no obligation with respect to any product that has been improperly installed adjusted operated or not maintained in accordance with national and local codes or installation instructions provided with the product or any product that has its serial number defaced obliterated or removed or which has been...

Страница 2: ...Part 9229077 07 05 Page ...

Страница 3: ...oning And Setup 7 Air Supply And Ventilation 7 Gas Connection 7 Manual Shut off Valve 7 Pressure Regulator 7 Rigid Connections 8 Flexible Couplings Connectors 8 Manual Pilot Valve 8 Initial Pilot Light 9 Shut Down 9 Final Preparation 9 Cleaning And Maintenance 9 Daily GXC Series 9 Daily GXR Series 10 Periodic 10 Cleaning Stainless Steel 10 Service And Parts 10 ...

Страница 4: ...ssionally trained personnel Description GXC SERIES GXR SERIES 24 30 36 48 60 24 30 36 48 60 Width In mm 24 610 30 762 36 914 48 1219 60 1524 24 610 30 762 36 914 48 1219 60 1524 Depth In mm 31 3 8 797 All Models Height In mm 20 508 All Models No Burners 2 2 3 4 4 4 5 6 8 10 BTU Hr Nat Pro 90 000 90 000 135 000 180 000 180 000 72 000 90 000 108 000 144 000 180 000 Gas Manifold 3 4 NPT 3 4 NPT 3 4 N...

Страница 5: ...Coals SHIPPING INFORMATION Model No Description Total BTU Lbs Kg Cube Dimensions LxDxH In mm GXC24 24 Wide Broiler 90 000 283 128 30 762 x 40 1016 x 27 656 GXC30 30 Wide Broiler 90 000 338 153 36 914 x 40 1016 x 27 656 GXC36 36 Wide Broiler 135 000 391 177 42 1067 x 40 1016 x 27 656 GXC48 48 Wide Broiler 180 000 505 229 54 1372 x 40 1016 x 27 656 GXC60 60 Wide Broiler 180 000 620 281 60 1524 x 40 ...

Страница 6: ...as In the event you have any questions concerning the installation use care or service of the product write or call our Product Service Department WARNING All Garland Char Broilers must be connected only to the type of gas identified on the rating plate INSTALLATION General Installation IMPORTANT Safe and satisfactory operation of your equipment depends to a great extent on its proper installation...

Страница 7: ...oilers must be under a vent hood Filters and drip troughs should be part of any industrial hood but consult local codes before constructing and installing a hood Air movement should be checked during installation Strong exhaust fans in this hood or in the overall air conditioning system can product a slight vacuum in the room and or cause air drafts either of which can interfere with pilot or burn...

Страница 8: ...liances CAN CGA 6 16 and a quick disconnect device that complies with the Standard for Quick Disconnect Devices for Use With Gas Fuel ANSI Z21 41 or Quick Disconnect Devices for Use with Gas Fuel CAN1 6 9 and adequate means must be provided to limit the movement of the appliance without depending on the connector and the quick disconnect device or its associated piping to limit the appliance movem...

Страница 9: ...several times until the new lines are purged of any trapped air and constant gas flow is attained Shut Down 1 Turn top burner valves clockwise to OFF position 2 When shutting down for periods longer than overnight turn the manual ON OFF valve on the incoming service line OFF Close all pilot adjusting screws right hand turn all the way in Final Preparation New units are wiped clean with solvent at ...

Страница 10: ...ast the radiants is connected by a second pan covering the reminder of the broiler bottom The front tray must be checked frequently during operation and drained as necessary the rear drip pan should also be checked occasionally Spills should be wiped as they occur and at the end of the day both pans should be washed in hot soapy water Periodic Your Garland Char Broiler should be checked and adjust...

Страница 11: ...Part 9229077 07 05 Page 11 NOTES ...

Страница 12: ......

Отзывы: