manualshive.com logo in svg
background image

13

Input Which Causes

Cycle Steps When Alarm

Alarm

Alarm

Tower

the Alarm

May Be Activated

Number

Description

Operating

(See Figure 4.6)

(See Figures 4.7 & 4.8)

Mode

Number

Status

Fixed

Demand

Cycle

Cycle

L1

Low Tower Pressure

I0.0

Off

00-15

00-15

R1

Drying

I0.1

L2

Early dew point

I0.6

On

NA

08

R2

breakthrough

L3

Failure to

I0.0

On

03, 05-08,

03, 05-09,

R3

Depressurize

I0.1

13

13

L4

Low or no Blower Pressure

I0.2

Off

07,08

07-09

R4

L5

High Heater Element

Regeneration

I0.3

On

06-08

06-09

R5

Temperature

L6

Incomplete Heating

I0.4

Off

14

14

R6

I0.5

L7

Failure to

I0.0

Off

15

15

R7

Repressurize

I0.1

L8

High Outlet Dew Point

Analog input

Dew point

08-15

08-15

Drying

from dew point

exceeds user

R8

monitor

spec'd set point

6 Hour Cycle (3 Hour Drying Per Tower)

                                        Fixed Cycle Step Length (Minutes)

Step

One Stage Regeneration

Two Stage Regeneration

Step

Number

(Standard)

(Optional)

Description

L00, R00

0.5

0.5

Open inlet valve to on-line tower

L01, R01

0.5

0.5

Close inlet valve to off-line tower

L02, R02

4.0

4.0

Depressurize off-line tower

L03, R03

0.5

0.5

Examine off-line tower pressure switch

L04, R04

0.5

0.5

Open purge valve

L05, R05

0.5

0.5

Examine off-line tower pressure switch

L06, R06

0.5

0.5

1st stage regeneration

L07, R07

50.0

50.0

1st stage regeneration (continued)

L08, R08

115.5

80.0

1st stage regeneration (continued)

L09, R09

0.5

0.5

1st stage regeneration extended for demand cycle

L10, R10

N/A

1.0

Partially pressurize off-line tower to seat purge check valve

L11, R11

N/A

2.0

Depressurize off-line tower

L12, R12

N/A

0.5

Open purge valve

L13, R13

N/A

32.0

2nd stage regeneration

L14, R14

6.5

6.5

Repressurize off-line tower

L15, R15

0.5

0.5

Examine off-line tower pressure switch

Total

180.0

180.0

Drying time per tower

Figure 4.10 - Alarms

If the dryer has one stage regeneration (standard), steps 10 through 13 are skipped.

Under DEMAND cycle operation, steps L09, R09, L15, and R15 are variable length.  The minimum time is shown above for these steps and for the drying time per tower.

Figure 4.9 - Operating Schedule:  Cycle Times

Содержание DEB Series

Страница 1: ...vicing B Electrical This equipment requires electricity to operate Install equipment in compliance with national and local electrical codes Equipment supplied as standard is not intended for installat...

Страница 2: ...alternated on and off line so that dry desiccant is always in contact with the wet com pressed air resulting in a continuous supply of dry air downstream The switching from one tower to the other is...

Страница 3: ...perature and capable of removing all desiccant fines 1 micron and larger should be provided The use of bypass valves and piping allows servicing of the filters and or dryer without interrupting the ai...

Страница 4: ...Valve Purge Exhaust Left Purge Valve Left Purge Pilot Valve Left Inlet Valve Left Inlet Pilot Valve Purge Exhaust Muffler Right Depressurization Valve Temperature Gauge Back Front Air Inlet Left Depr...

Страница 5: ...s returned to normal operation auto stop disabled the dryer will return to demand cycle operation Auto stop is enabled or disabled through the opera tor interface The dryer can be returned to normal o...

Страница 6: ...the right tower and exits through the right purge valve V4 The blower intake air is filtered F1 to keep dust and dirt from entering the dryer The blower B1 and heater H1 are de energized when the temp...

Страница 7: ...The pressure in the right tower begins to rise and check valve V10 is seated Next the repressurization valve V15 is closed and the depressurization valve V6 is opened depressurizing the tower Finally...

Страница 8: ...all times 4 The F4 key performs three different functions as described in Menu s 3 4 and 5 The F4 key is only active when one of these menus is displayed 5 Use the UP ARROW and DOWN ARROW triangular...

Страница 9: ...4 to identify the active alarm s Then refer to the Troubleshooting Guide Section 5 0 for help in correcting the alarm condition After correcting an alarm condition use the F1 key on the operator inte...

Страница 10: ...ized Q1 0 9SOL Repressurization pilot valve When the solenoid is energized pilot air opens the repressurization valve when de energized pilot air closes the repressurization valve Q1 1 M Blower motor...

Страница 11: ...3 PLC Inputs Left Tower Drying and Outputs Step Number I O No Device L00 L01 L02 L03 L04 L05 L06 L07 L08 L09 L10 L11 L12 L13 L14 L15 I0 0 LPS I0 1 RPS I0 2 BPS I0 3 HHC I0 4 LTS I0 5 RTS I0 6 DPM I0 7...

Страница 12: ...r I O No Device L00 L01 L02 L03 L04 L05 L06 L07 L08 L09 L10 L11 L12 L13 L14 L15 I0 0 LPS I0 1 RPS I0 2 BPS I0 3 HHC I0 4 LTS I0 5 RTS I0 6 DPM I0 7 Jumper 1 I1 0 Jumper 2 I1 1 I1 5 Not Used Q0 0 1 SOL...

Страница 13: ...valve to on line tower L01 R01 0 5 0 5 Close inlet valve to off line tower L02 R02 4 0 4 0 Depressurize off line tower L03 R03 0 5 0 5 Examine off line tower pressure switch L04 R04 0 5 0 5 Open purg...

Страница 14: ...exhaust piping indicating valve is not completely closed Check for loss of pilot air see Section 5 1 4 Check for left purge pilot valve V13 failure check valve operation Repair or replace as necessar...

Страница 15: ...eration cycle 1 False alarm Heater hi limit thermocouple check thermocouple circuit for continuity Repair or replace as necessary Heater hi limit controller TC2 or TC4 malfunction check controller ope...

Страница 16: ...upply Check compressor supplying dryer 2 Excessive air demand Check equipment downstream of dryer 3 Faulty right tower pressure Check pressure switch operation using right tower pressure gauge switch...

Страница 17: ...clean or replace 2 Improper setting on blower pressure Check pressure switch operation Readjust switch setting or replace switch PS3 switch if defective 3 Loss of pressure to blower pressure Check lin...

Страница 18: ...ee Section 5 9 3 2 Right purge valve V4 failed to close See Section 5 9 5 3 Right depressurization valve V6 See Section 5 9 6 failed to close 4 Repressurization valve V15 failed Loss of pilot air see...

Страница 19: ...motor instruction tag 6 3 Blower Pressure Switch The blower pressure switch located in the main electrical enclosure is adjustable Verify that the switch is open when the blower is off and closed whe...

Страница 20: ...ages liability of the manufacturer is the original purchase price of the product or part THE FOREGOING WARRANTY IS EXCLUSIVE AND IN LIEU OF ALL OTHER WARRANTIES WHETHER WRITTEN ORAL OR STATU TORY AND...

Отзывы: