Installation
22
Figure 3-2
Rear Panel of the Interface 5000
Power-up Test
Before you make any other connections to your Interface 5000, check that the Interface 5000 is at least
nominally functional.
After connecting DC power to the Interface 5000, push in the
Power
button on the front panel of the Interface
5000).
Watch the
PWR
LED as the Interface 5000 powers up. It flashes slowly four or five times (depending on the
amount of software loading), then glows a steady blue. This process could take as long as 15 seconds. The
Interface 5000 fan runs at low speed after the
PWR
light stops flashing. If you do not see four or five blinks and
then a steady blue color, see Appendix D for a table of blink codes.
The status of the other LED indicators is not important at this time.
USB
Power In
PWR LED
Power button
Содержание Interface 5000
Страница 2: ...2 ...
Страница 18: ...Introduction 18 ...
Страница 30: ...Installation 30 ...
Страница 36: ...Calibration 36 ...
Страница 64: ...Appendix A Interface 5000 Specifications 64 ...
Страница 72: ...Appendix D Power LED Blink Codes and Error Messages 72 ...
Страница 74: ...Appendix E CE Certificate Declaration of Conformity 74 Low Voltage Certificate of Conformance ...
Страница 75: ...Appendix E CE Certificate Declaration of Conformity 75 RFI Certificate of Conformance ...
Страница 76: ...Appendix E CE Certificate Declaration of Conformity 76 ...
Страница 80: ...Appendix F Heat in Interface 5000 Multichannel Systems Interface Power Hub Systems 80 ...
Страница 85: ......
Страница 86: ...734 Louis Drive Warminster PA 18974 Tel 215 682 9330 Fax 215 682 9331 www gamry com info gamry com ...