
Cell Connections
35
Testing for Open Fuses
A Gamry Instruments Framework test checks for blown fuses without having you remove the fuses. A simple
Potentiostatic test is run on the Calibration Cell. Run the test using the
SET A VOLTAGE.EXP
script in the
Framework’s
Utilities
package.
Connect the cell leads to the Calibration Cell. You do not need to place the Calibration Cell within a Faraday
cage. Select the command
Experiment
>
Utilities
>
Set a Voltage
on the Framework software
’s menu bar.
You see a
Set a Voltage
dialog box similar to this:
Figure 6-4
Setup Dialog Box for the Set a Voltage Script
In the
Voltage
field, enter a
Voltage
of 1 V as shown above, then click the
OK
button. The Framework opens a
runner window, and a graph of current versus time should appear:
Caution:
Always replace the fuses in an EIS Box cable with the recommended fuse. Use
of an improper fuse, especially a fuse with a higher current rating, can cause instrument failure if a battery
cell is improperly connected. Use of a non-approved fuse void
s Gamry Instruments’ factory warranty.
Содержание EIS Box
Страница 2: ...2...
Страница 6: ...6...
Страница 14: ...Safety Considerations 14...
Страница 20: ...20...
Страница 28: ......
Страница 49: ...Appendix C CE Certificate 49 Appendix C CE Certificate Certificate of Conformance...
Страница 50: ...50...
Страница 52: ...52 Work Shield 49 Working electrode 33 34 35 39 49...