7
Priming A New Heat Exchanger
A brand new Heat Exchanger should first be filled with water (“primed”) before it is used. to prime a new Heat
Exchanger read through the Control Unit Set up on page 8 and Getting Started on page 11 and then follow the
steps below:
1. open Heat Exchanger, lay flat on the ground and connect the Heat Exchanger to Control Unit.
2. Press the pressure button on the control panel to set the pressure on “no pressure”.
3. Press the start button.
4. run for a minimum of two minutes.
Note: often when priming the Full leg Heat Exchanger, the Control Unit alarm will sound after 45 seconds, the
low flow icon will flash and the Control Unit will stop. this is because there isn’t enough water returning to the
Control Unit, due to the new Heat Exchanger being filled. to continue, simply restart the priming process
following the steps above. After 2 minutes the Heat Exchanger is fully primed and ready to be used. repeat the
steps above for each additional new Heat Exchanger.
Power (on/off)
Second tick marks
Green indicates unit has power
Pressure display
Start/pause
Timer setting
Timer on
Decrease time
Increase time
Pressure setting
Alarm silencer
Celsius/Fahrenheit
C o N t r o l P A N E l / B A S I C C o N t r o l S
Содержание Equine 550250
Страница 1: ...EQU INE Contr ol Uni t User s Manual Model 550250...
Страница 2: ......
Страница 4: ......