G
AMATRONIC
E
LECTRONIC
I
NDUSTRIES
L
TD
.
12
P+ PREMIUM 60, Installation Guide,
rel.
1.4
9.
Restore the metal panel on which the static switch PCB sits, to its original position , and reinsert the
screws that you removed in steps 4 and 5 above.
10. Reattach the bottom front panel of the UPS, which you removed at the start of this procedure.
(If you disconnected the cables from the bottom front panel at the start of this exercise, you must
reconnect them first.)