GPS 2300 PFC BI-PULSE
23
3.5.1. TIG SYSTEM INSTALLATION. TORCH TO NEGATIVE POLE.
MARK
Ref.
DESCRIPTION
REMARKS
1
INCLUDED
Input cable 3x2.5 mm
2
, 3 m (with
Schuko plug incl.)
5
INCLUDED
Machine-gas connection
9
INCLUDED
Earth clamp cable
6
376.00.000
Argon pressure regulator – Mod. EN 2
6
379.00.000
GASFREE Argon-CO
2
pressure
regulator
Gas saving (up to 50%)
10
190.52.634
TIG XT-26E Torch
“Euro" connection (4 m)
3.5.2. TIG SYSTEM START-UP.
1) Make sure the mains voltage is 230 V.
2) Verify that the torch polarity is negative (this can be seen by opening the mobile side of the equipment).
3) Check that the gas is Argon and adjust the flow rate between 6 and 10 l/min. If using a mobile workstation, check
that the gas bottle is held by the bottle holder system.
4) Install the pressure regulator 6 and connect gas hose 5 checking that there are no leakages throughout the whole
circuit.
5) Connect the TIG torch 10 to Euro-connector B.
6th ) Bleed gas by means of the
push-button, checking that the flow rate is between 6 and 10 l/min.
Содержание GPS 2300 PFC BI-PULSE
Страница 36: ...GPS 2300 PFC BI PULSE 36 NOTES...
Страница 40: ...REPUESTOS GPS 2300 PFC REF 532 00 100 15 1 19 HR 53200100 V0 1 2 PARTS LIST GPS 2300 PFC 1Ph 230V 50 60 Hz...
Страница 42: ......