42
5080004995ind01 en 04/02 HN
Installation
Proceed as follows:
– When unpacking the appliance, check it for
transport damage.
– Please remove the adhesive tapes that protect the
door during transport.
– A flexible cable should be used as the power
main lead. The cross-section must be selected
according to the rated current consumption and
the type of connection.
– Push the appliance into the item of furnishing. Use
the included wood screws to firmly bolt it to the
face timber surface of the conversion cabinet on
the handle and hinge side, directly underneath
the bottom panel.
Note:
Use a level to check that the oven is installed
exactly horizontally.
– After installing, ensure that wires are protected
against contact.
– Finally test the oven for correct functioning.
– Thoroughly clean the appliance and accessories
before using them for the first time.
(see ”Cleaning and Care”)
Minimum distance of 4"
between wall and appliance
to allow full opening of door.
1
3
/
8
"
(35)
3
/
8
" (10)
42
1
/
2
"
(1080)
27
1
/
8
"
(690)
43"
(1090)
42
3
/
4
"
(1085)
min. 26"
(min. 660)
min. 22
7
/
8
"
(min. 580)
25
5
/
8
"
(650)
22
1
/
4
"
(565)
3
3
/
8
"
(85)
7
/
8
"(23)
1
5
/
8
"(42)
2
3
/
8
"
(60)
Fig. 52
Note:
Weight of the unit with accessories is
130 kg (286 lb).
The supporting surface of the built-in cupboard
must be designed for a load carrying capacity of
at least 140 kg (308 lb).
Note:
The appliance must only be transported in an
upright position!
Do not lift the appliance by the door handle!