2. WIRING
2-43
2.8
Intelligent HUB HUB-3000 (option)
Fix the LAN cable connected to the cable clamp using the cable ties (supplied).
No use.
Power port
Power Fail
LAN port
Ground wire
(IV-1.25sq., supplied)
DPYC-1.5 cable
DPYC-1.5 cable
to gateway network (ECDIS, radar, etc.)
Attach the LAN cap (supplied) to the unused connector
holes to provide waterproofing standard IPX2.
LAN cable
Cable clamp
Содержание FCR-2139S-BB
Страница 74: ...2 WIRING 2 48 This page is intentionally left blank ...
Страница 136: ...D 1 14 Feb 2011 Y NISHIYAMA ...
Страница 137: ...D 2 Y Hatai ...
Страница 138: ...May17 07 R Esumi D 3 ...
Страница 139: ...13 Feb 2014 H MAKI D 4 ...
Страница 140: ...D 5 24 May 2012 Y NISHIYAMA ...
Страница 141: ...D 6 24 May 2012 Y NISHIYAMA ...
Страница 142: ...D 7 24 May 2012 Y NISHIYAMA ...
Страница 143: ...D 8 ...
Страница 144: ...D 9 ...
Страница 145: ...D 10 ...
Страница 148: ...13 Jan 2012 Y NISHIYAMA 西山義浩 D 13 ...
Страница 149: ...13 Jan 2012 Y NISHIYAMA D 14 ...
Страница 150: ...D 15 ...