© The Fulton Companies 2012
MAINTENANCE
RLN-IOM-2012-1205
SECTION 4
4-4
!
WARNING
Follow proper lockout / tag out
procedures for the electrical, gas and
water connections. Use caution when
lifting heavy parts.
4
CAUTION
All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct,
and strict adherence to applicable
jurisdictional/professional codes and
regulations.
All maintenance procedures should
be completed by trained personnel.
Appropriate training and instructions
are available from the Fulton Service
Department at (315) 298-5121 or your
local Fulton Representative.
In order to meet warranty conditions,
ensure all appropriate maintenance
activities are performed.
jacket. Remove the two vertical rails and the upper and lower bands. Now
the front third of the inner jacket may be removed.
§
If soot or other debris is present, the heat exchanger must be cleaned.
If cleaning is necessary, remove the burner/blower assembly prior to
washing the copper fi nned tubes with water and non-corrosive soap.
§
Examine the gaskets and note signs of deterioration, replace if necessary.
§
Green scale on the copper tubes indicates that the boiler is or has
been experiencing fl ue gas condensation in the heat exchanger; this is
detrimental to the life of any copper fi nned tube heat exchanger. This may
be the result or an improperly designed system operating at low water
temperatures, or substantial cold start-up periods. Copper fi nned tube
heat exchangers are susceptible to failure if there are system return water
temperatures below 140 F present. Inspect for the presence of leaking or
failed tubes. A replacement heat exchanger may be necessary.
¡
Examine the Venting System
1. Check all joints and pipe connections for tightness.
2. Check vent for corrosion or deterioration. If any venting needs replacing,
do so immediately.
3. Perform any recommended maintenance as required by the vent material
manufacturer.
FIGURE 22 - BURNER WITH IGNITION ASSEMBLY MOUNTED
Содержание Reliance 1000
Страница 2: ......
Страница 4: ...TheFultonCompanies2012 TABLEOFCONTENTS RLN IOM 2012 1205 0 2...
Страница 42: ...TheFultonCompanies2012 OPERATION RLN IOM 2012 1205 SECTION3 3 12...
Страница 50: ...TheFultonCompanies2012 MAINTENANCE RLN IOM 2012 1205 SECTION4 4 8...
Страница 51: ......
Страница 52: ......
Страница 59: ......