Questions? Call (315) 298-5121, or visit us online at www.fulton.com
SECTION 3
RLN-IOM-2012-1205
OPERATION
3-7
13.
Manually decrease the fi ring rate by 500 rpm increments observing
combustion down to the low fi re rpm setting (minimum) on the factory
test fi re sheet. If required low fi re combustion may be altered by adjusting
the off set adjustment screw with either a Torx®T40 or a 5mm hex wrench.
NOTE:
´
Turning the screw counterclockwise decreases gas fl ow, clockwise
increases gas fl ow.
14. Before leaving the “Firing Rate” screen, tap “Automatic” fi ring rate control.
Do not leave the unit in the “Manual in Run” mode.
Shut Down Procedures
¡
Normal Shut Off Procedures
1. Place the local/off /remote switch in the off position.
2. Close all manual gas valves.
3. Turn off electrical power.
¡
Emergency Shut Off Procedures
The main gas cock should be closed immediately. If overheating occurs or the gas
supply fails to shut off , do not turn off or disconnect the electrical supply to the
pump. Instead, shut off the gas supply at a location external to the boiler.
¡
Shutting the Boiler Down for an Extended Period of Time
If the boiler is to be shut off for a period greater than 3 months:
1. Perform normal shut down procedure
2.
Isolate water supply and fl ow circuit from boiler
3. Drain boiler
4. Disconnect electrical supply
¡
Starting Boiler After Prolonged Shutdown
Perform initial start up procedures as described in this manual.
SOLA Control Features
¡
Flame Detection
The fl ame signal can be viewed from the Main Screen and the Status Detail
screen on the Control. See Figure 13.
!
WARNING
All information in this manual is for
reference and guidance purposes,
and does not substitute for required
professional training, conduct, and strict
adherence to applicable jurisdictional/
professional codes and regulations.
4
CAUTION
Only factory-trained personnel should
attempt to alter password protected Control
preset values.
Содержание Reliance 1000
Страница 2: ......
Страница 4: ...TheFultonCompanies2012 TABLEOFCONTENTS RLN IOM 2012 1205 0 2...
Страница 42: ...TheFultonCompanies2012 OPERATION RLN IOM 2012 1205 SECTION3 3 12...
Страница 50: ...TheFultonCompanies2012 MAINTENANCE RLN IOM 2012 1205 SECTION4 4 8...
Страница 51: ......
Страница 52: ......
Страница 59: ......