6.3.1.2

Installing a 3.5-inch HDD module

Figure 21: Opening the 3.5-inch HDD module locking lever

Ê

Pinch the green locking clip (1) and open the locking lever (2).

Figure 22: Installing the 3.5-inch HDD module

Ê

Install the HDD module into a drive bay and carefully push back as far as it 
will go (1).

Ê

Close the locking lever to lock the HDD module in place (2).

Ê

When using a RAID array, add the additional HDD/SSD to the RAID array.

I

Configuring the RAID array, see the documentation of the RAID 
controller, used in your configuration, see section 

"Documentation 

overview" on page 13

.

Содержание PRIMERGY TX2550 M5

Страница 1: ...Operating Manual English FUJITSU Server PRIMERGY TX2550 M5 Operating Manual May 2019 ...

Страница 2: ...Dokumentation mbH www cognitas de Copyright 2019 FUJITSU LIMITED All rights reserved Delivery subject to availability right of technical modifications reserved All hardware and software names used are trademarks of their respective manufacturers The contents of this manual may be revised without prior notice Fujitsu assumes no liability for damages to third party copyrights or other rights arising...

Страница 3: ...oard assemblies of the product and in the mouse and keyboard are limited life components Use of these components beyond their operating life may result in electrolyte leakage or depletion potentially causing emission of foul odor or smoke As a guideline in a normal office environment 25 C operating life is not expected to be reached within the maintenance support period 5 years However operating l...

Страница 4: ...for high safety use Measures against momentary voltage drop This product may be affected by a momentary voltage drop in the power supply caused by lightning To prevent a momentary voltage drop the use of an uninterruptible power supply is recommended This notice follows the guidelines of Voltage Dip Immunity of Personal Computer issued by JEITA the Japan Electronics and Information Technology Indu...

Страница 5: ...ith SATA BC SATA storage interfaces Please note that the usage and operation conditions differ depending on the type of HDD used For more information on the usage and operation conditions of each available type of HDD see the following internet address http jp fujitsu com platform server primergy harddisk ...

Страница 6: ...Operating Manual TX2550 M5 ...

Страница 7: ... 27 3 3 1 2 Server rear 28 3 3 2 Controls and indicators on the server front 29 3 3 2 1 Controls on the front panel 29 3 3 2 2 Indicators on the front panel 30 3 3 2 3 Indicator on the ODD 34 3 3 2 4 Indicators on the hot plug HDD SSD module 35 3 3 3 Indicators on the server rear 36 3 3 3 1 Indicators on the I O panel 36 3 3 3 2 Indicator on hot plug PSU 41 4 Important information 43 4 1 Safety in...

Страница 8: ...ith ServerView Installation Manager 72 5 7 1 Configuring the server and installing the operating system 72 5 7 1 1 Configuring the controllers 73 5 7 1 2 Installing the operating system 73 5 8 Configuring the server without ServerView Installation Manager 74 5 8 1 Configuring the server and installing the operating system 74 5 8 1 1 Configuring the onboard SAS SATA controller 74 5 8 1 2 Installing...

Страница 9: ...alling a 3 5 inch HDD module 83 6 3 2 Installing 2 5 inch HDD SSD modules 84 6 3 2 1 Removing a 2 5 inch HDD SSD dummy module 84 6 3 2 2 Installing a 2 5 inch HDD SSD module 84 6 4 Installing a second PSU 86 6 4 1 Removing the dummy cover 86 6 4 2 Installing a PSU 86 6 5 Cleaning the server 88 7 Troubleshooting and tips 89 8 Technical data 97 9 Warranty and service 105 ...

Страница 10: ...Operating Manual TX2550 M5 Content ...

Страница 11: ...ata transmission and you will require a basic knowledge of the underlying operating system 1 1 Notational conventions The following notational conventions are used in this manual Text in bold Indicates references to names of interface elements Text in monospace Indicates commands Quotation marks Indicate names of chapters and terms that are being emphasized Ê Describes activities that must be perf...

Страница 12: ...12 Operating Manual TX2550 M5 Introduction ...

Страница 13: ...n also be downloaded as a DVD ISO image at ftp ftp ts fujitsu com images serverview manuals For Japan http www fujitsu com jp products computing servers primergy downloa ds Document Description Safety Notes and Regulations manual 安全上のご注意 for Japan Important safety information available online or as a printed copy FUJITSU Server PRIMERGY TX2550 M5 Operating Manual Information how to install set up ...

Страница 14: ...de iRMC S5 Concepts and Interfaces user guide iRMC S5 Configuration and Maintenance user guide iRMC S5 Web Interface user guide ServerView embedded Lifecycle Management eLCM user guide Illustrated Spares catalog Spare parts identification and information system not valid for Japan available for online use or download Windows OS at http manuals ts fujitsu com illustrated_sp ares or from the CSS com...

Страница 15: ...pan Additional documentation RAID documentation available online at http manuals ts fujitsu com under x86 Servers Expansion Cards Storage Adapters NVMe User Guide available online at http manuals ts fujitsu com under x86 Servers Expansion Cards PCIe SSD Devices SSD PCie3 Main 2 5 H P EP For Japan http www fujitsu com jp products computi ng servers primergy manual Third party documentation Operatin...

Страница 16: ...16 Operating Manual TX2550 M5 Before you start ...

Страница 17: ...the server and information on the features of the PRIMERGY TX2550 M5 server The PRIMERGY TX2550 M5 server is available as a floorstand model and a rack model The floorstand model can be converted to a rack model using an optional conversion kit 3 1 Overview of the server 3 1 1 Server front ...

Страница 18: ...nch HDD SSD model example TX2550 M5 rack model Figure 2 Server front 2 5 inch HDD SSD model example TX2550 M5 floorstand model Pos Component 1 2 5 inch HDDs SSDs dummy modules 2 ODD 5 25 inch dummy module 3 ID card 4 8x 2 5 inch HDD extension box 8x 2 5 inch PCIe SSD extension box 5 Front panel module ...

Страница 19: ...model Figure 3 Server front 3 5 inch HDD model example TX2550 M5 rack model Figure 4 Server front 3 5 inch HDD model example TX2550 M5 floorstand model Pos Component 1 3 5 inch HDDs dummy modules 2 ID card 3 4x 3 5 inch HDD extension box 4 ODD 5 Front panel module ...

Страница 20: ...nd I O panel of the PRIMERGY server provide you with information if a CSS event arises In addition CSS errors are displayed in the ServerView Operations Manager the server management software from Fujitsu In the event of errors the ServerView Operations Manager refers you directly to the affected component and its order information in the Illustrated Spares catalog of the server in question This f...

Страница 21: ...g drive encryption using Windows Bitlocker Drive Encryption The TPM is activated via the BIOS for more information see the D3386 BIOS Setup Utility for FUJITSU Server PRIMERGY TX2550 M5 Reference Manual V CAUTION When using the TPM note the program descriptions provided by the third party manufacturers You must also create a backup of the TPM content To do this follow the third party manufacturer ...

Страница 22: ...5 C depending on your system and configuration V CAUTION In a system that is configured with ATD only certain components which support the respectively increased higher operating temperature range may be installed and used For applicable restrictions see the official configurator tool High level of availability and data security When memory data is accessed 1 bit errors are identified in the main ...

Страница 23: ... servers that are in the out of band system status Major functions supported by the iRMC S5 include the following Browser access via the own Web server of the iRMC S5 Secure communication SSH SSL Power Management for the managed server depending on its system status Power Consumption Management Connecting virtual drives as remote storage Text based and graphic console bypass Advanced Video Redirec...

Страница 24: ...GY servers in the network via a central console The ServerView Operations Manager supports the following functions Round the clock monitoring regardless of server status High performance graphical console bypass AVR protected by HTTPS SSL 128 bit Remote storage via USB Remote power on Intrusion detection in the floorstand model Temperature monitoring of the CPU and the surrounding area Detailed st...

Страница 25: ...agnostic LEDs fitted on the system board indicate which component memory module CPU fan or expansion card is not functioning properly The Flash EPROM program supplied with the Fujitsu utilities supports a fast BIOS update With the iRMC on the system board the server can also be maintained and serviced remotely This enables remote diagnosis for system analysis remote configuration and remote restar...

Страница 26: ...s also fitted with two intrusion detection switches which enable the ServerView Operations Manager to detect and log any removal of the housing cover and the cover for the HDD SSD modules To prevent that the server is being removed from its location the floorstand model can be secured to a fixed object with a steel cable running through a clip on the back The rack model is protected against unauth...

Страница 27: ...X2550 M5 Operating Manual 27 Product description 3 3 Connectors controls and indicators 3 3 1 Connectors on the server 3 3 1 1 Server front Figure 5 Connectors on the front panel 1 2x USB 3 0 connectors ...

Страница 28: ...re information see the corresponding BIOS Setup Utility reference manual I Some of the devices connected require special software e g drivers see documentation for the connected device 1 Serial connector optional 5 2x USB connectors USB 3 0 2 Shared LAN connector 6 Video connector VGA 3 LAN connector 7 Management LAN connector for iRMC server management function 4 2x USB connectors USB 3 0 8 Dedic...

Страница 29: ...rols on the front panel Figure 7 Controls on the front panel module Pos Label Button Function 1 RESET Reset button Reboots the system Press the reset button with a straightened end of a paper clip V CAUTION Risk of data loss 2 NMI NMI button Used to troubleshoot software and device driver errors Press the NMI button with a straightened end of a paper clip V CAUTION Use this button only if directed...

Страница 30: ...m is running an ACPI compliant operating system pressing the On Off button will perform a graceful shutdown Pos Label Indicator Status Description 1 ID ID indicator see also iRMC related status signals on page 38 blue on The server has been highlighted using ServerView Operations Manager iRMC web interface or the ID button on the front panel for easy identification flashing blue The server has bee...

Страница 31: ...non CSS component flashing orange Non CSS component failure detected Possible causes System is out of the specified temperature range Defective sensor CPU error Error detected by server management software 4 HDD SSD activity indicator flashing green Data access in progress 5 Power on indicator off The server is switched off green on The server has been switched on but Power Cycle Delay settings de...

Страница 32: ...witched on but Power Cycle Delay settings delay it from turning on for a specified time I After connecting the server to the mains it will take about 60 seconds until the server will enter standby mode and can be switched on off The server is switched off and not connected to the mains The server is switched on and operating normally Pos Label Indicator Status Description ...

Страница 33: ...e 1 2 or later supported OOB RAID system ID indicator Global error indicator Description flashing blue off A remote connection has been established Local VGA output has been disabled during the remote session flashing blue flashing orange An emergency flash of the iRMC firmware is in progress I For more information on the emergency flash of the iRMC firmware see the FUJITSU Server PRIMERGY TX2550 ...

Страница 34: ... description 3 3 2 3 Indicator on the ODD I ODDs may have an indicator or not Figure 9 Example Indicator on the ODD Pos Indicator Status Description 1 Activity indicator off The ODD is inactive green on The storage medium is being accessed ...

Страница 35: ... inactive green on The HDD SSD being accessed 2 Error indicator off No HDD SSD error detected orange on An HDD SSD error has been detected Possible causes The drive is defective and needs replacing A RAID rebuild process has failed The HDD SSD module has not been inserted correctly flashing orange slowly HDD SSD RAID rebuild is in progress Data is being restored after replacing a drive that has be...

Страница 36: ...36 Operating Manual TX2550 M5 Product description 3 3 3 Indicators on the server rear 3 3 3 1 Indicators on the I O panel ID CSS and Global Error indicators Figure 11 ID CSS and Global Error indicators ...

Страница 37: ... has been highlighted using ServerView Operations Manager iRMC web interface or the ID button on the front panel for easy identification flashing blue The server has been highlighted for easy identification using the iRMC AVR with disabled local VGA output CSS CSS indicator off No critical event detected CSS component orange on Prefailure event detected CSS component flashing orange CSS component ...

Страница 38: ... blue off A remote connection has been established Local VGA output has been disabled during the remote session flashing blue flashing orange An emergency flash of the iRMC firmware is in progress I For more information on the emergency flash of the iRMC firmware see the FUJITSU Server PRIMERGY TX2550 M5 Upgrade and Maintenance Manual ...

Страница 39: ...LAN link transfer indicator green on A LAN connection has been established off LAN is not connected flashing green LAN data transfer is in progress 2 LAN speed indicator yellow on Data traffic at a transfer rate of 1 Gbit s green on Data traffic at a transfer rate of 100 Mbit s off Data traffic at a transfer rate of 10 Mbit s ...

Страница 40: ...The separate management LAN connector is used as a management interface iRMC S5 and is prepared for operation with the Remote Management Optionally LAN connector 1 can also be used for iRMC S5 server management Pos Indicator Status Description 1 LAN link transfer indicator short flashing green 3x then off A LAN connection has been established 1 Gbit or 100 Mbit and EEE mode is active 2 LAN speed i...

Страница 41: ...tatus indicator flashing green The server is switched off but mains voltage is present standby mode green on The server is switched on and operating properly flashing orange An overload has been detected The PSU is still running but failure might be imminent orange on An PSU failure has been detected Possible causes Over under voltage Overheating Fan failure 0 ...

Страница 42: ...42 Operating Manual TX2550 M5 Product description ...

Страница 43: ...ver in the intended environment please contact your sales outlet or our customer service team The actions described in this manual shall be performed by technical specialists A technical specialist is a person who is trained to install the server including hardware and software Repairs to the server that do not relate to CSS failures shall be performed by service personnel Please note that unautho...

Страница 44: ... C or 45 C If the server is integrated into an installation that draws power from an industrial power supply network with an IEC309 connector the power supply s fuse protection must comply with the requirements for non industrial power supply networks for type A connectors The server automatically adjusts itself to a mains voltage see the type label of your server Ensure that the local mains volta...

Страница 45: ...transmission lines during a storm risk of lightning hazard Ensure that no objects e g jewelry paperclips etc or liquids can get inside the server risk of electric shock short circuit In emergencies e g damaged casing controls or cables penetration of liquids or foreign bodies contact the server administrator or your customer service team Only disconnect the server from the mains power supply if th...

Страница 46: ...ll void the warranty and exempt the manufacturer from all liability The circuit boards and soldered parts of internal options are exposed and can be damaged by static electricity To ensure reliable protection you must wear an earthing band on your wrist when working with this type of module and connect it to an unpainted conducting metal part of the server Do not touch the circuitry on boards or s...

Страница 47: ... be followed V CAUTION Only use CDs DVDs BDs that are in perfect condition in order to prevent data loss equipment damage and injury Check each CD DVD BD for damage cracks breakages etc before inserting it in the drive Note that any additional labels applied may change the mechanical properties of a CD DVD BD and cause imbalance and vibrations Damaged and imbalanced CDs DVDs BDs can break at high ...

Страница 48: ...urces Do not bend or place heavy objects on CDs DVDs BDs Do not write with ballpoint pen or pencil on the label printed side Do not attach stickers or similar to the label side Doing so may cause rotational eccentricity and abnormal vibrations When a CD DVD BD is moved from a cold place to a warm place moisture condensation on the CD DVD BD surface can cause data read errors In this case wipe the ...

Страница 49: ...D label can be different When you handle ESD modules you must always observe the following points Switch off the server and remove the power plugs from the power outlets before installing or removing ESD modules The circuit boards and soldered parts of internal options are exposed and can be damaged by static electricity To ensure reliable protection you must wear an earthing band on your wrist wh...

Страница 50: ...the server by the handles or the Quick Release Levers QRLs on the front panel Notes on installing the server in the rack V CAUTION For safety reasons at least 2 people are required to install the server in the rack because of its weight and size For Japan see 安全上のご注意 Never lift the server into the rack using the QRLs on the front panel When connecting and disconnecting cables observe the relevant ...

Страница 51: ...nd operation Cleaning the server Keep all manuals close to the server All documentation must be included if the equipment is passed on to a third party 4 2 ENERGY STAR Products that have been certified compliant with ENERGY STAR and labelled are in full compliance with the specification at shipping Note that energy consumption can be affected by software that is installed or any changes that are m...

Страница 52: ...es certificates default aspx To open the CE declaration applicable for your system proceed as follows Ê Select Industry Standard Servers Ê Select your model e g Rack server Ê Select your system e g PRIMERGY RX2530 M1 Ê Select CE Cert your system V CAUTION This is a Class A product In a domestic environment this product may cause RF interference in which case the user may be required to take adequa...

Страница 53: ...ence will not occur in a particular installation If this equipment does cause harmful interference to radio or television reception which can be determined by turning the equipment off and on the user is encouraged to try to correct the interference by one or more of the following measures Reorient or relocate the receiving antenna Increase the separation between equipment and the receiver Connect...

Страница 54: ...should be switched off until they are needed as well as during long breaks and after completion of work Packaging information This packaging information does not apply in Japan and APAC Do not throw away the packaging You may need it later for transporting the server If possible the equipment should only be transported in its original packaging Information on handling consumables Please dispose of...

Страница 55: ...mables within Europe can also be found in the Returning used devices manual via your local Fujitsu branch or at http ts fujitsu com recycling The device must not be disposed of with domestic waste This device is labeled in compliance with European directive 2012 19 EU on waste electrical and electronic equipment WEEE This directive sets the framework for returning and recycling used equipment and ...

Страница 56: ...56 Operating Manual TX2550 M5 Important information ...

Страница 57: ...heat Ensure that the server is acclimatized for the time indicated in this table before putting it into operation In the table Acclimatization time the temperature difference refers to the difference between the operating environment temperature and the temperature to which the server was exposed previously outside transport or storage temperature Temperature difference C Minimum acclimatization t...

Страница 58: ...s that have been ordered additionally may be delivered loose with the server For installing see the original component documentation Ê Install the server in the rack see section Installing the server in the rack on page 62 Ê Connect the devices to the server To do this see sections Notes on connecting disconnecting cables on page 67 and Connecting devices to the server on page 68 Ê Connect the ser...

Страница 59: ...er on page 72 Remote installation see section Configuring the server with ServerView Installation Manager on page 72 I For more information on installing the server remote or local see the ServerView Installation Manager user guide at http manuals ts fujitsu com under x86 Servers Software ServerView Suite Server Installation and Deployment Installation without ServerView Installation Manager Local...

Страница 60: ... in case you want to transport the server again does not apply to Japan Ê Check the delivery for any damage during transport Ê Check whether the items delivered match the details on the delivery note The product name and serial number of the product can be found on the ID card see section Documentation overview on page 13 Ê Notify your supplier immediately should you discover that the items delive...

Страница 61: ...server V CAUTION The device must be protected from direct sunlight The required minimum distances for operation and maintenance areas must be adhered to The server must be accessible at the rear for connection to other devices e g memory subsystem The mains plug must be accessible easily and safely There must be a clearance of at least 200 mm in front of and behind the server to ensure adequate ve...

Страница 62: ...extended out of the rack there is a risk that the rack could tip over Fujitsu rack systems The rack systems from Fujitsu support the installation of PRIMERGY servers PRIMECENTER rack PRIMECENTER M1 rack DataCenter rack 19 inch standard rack for Japan 19 inch slim rack for Japan I For information on mounting the server in the rack see the Mounting Instructions provided with the Rack Mounting Kit Fo...

Страница 63: ...ar alignment feature to ensure that they can be adjusted to different rack depths Asymmetrical PRIMECENTER rack and DataCenter rack provide an enhanced cable management in the lateral rack area 3rd party racks I Installation in most current rack systems from other manufacturers 3rd party racks is also supported For details please contact your sales representative Wire the server Read the informati...

Страница 64: ...rver weighs more than 21 kg and is to be installed above the height of 25 U When using a lifter this installation procedure needs to be carried out by maintenance personnel For configurations below 32 kg At least two people are needed to lift the server into the rack cabinet For configurations below 55 kg At least three people are needed to lift the server into the rack cabinet For configurations ...

Страница 65: ...ock in place 1 I The rack rails must click into place so that they can no longer be moved Ê At a slight angle lower the server onto the rear mounting point on the rack rails 2 Ê Fold down the server 3 Ensure that all six rack mounting bolts are properly seated in the mounting points on the rack rails and that the locking bars engage 4 ...

Страница 66: ... mechanism of both rack rails 1 Ê Push the server as far as it will go into the rack 2 until the quick release levers engage 3 V CAUTION Be careful with your fingers You can pinch them when the quick release levers change to the release position Ê Connect all cables except the power cord to the server rear ...

Страница 67: ...ting cables Ê Switch off the server and equipment switches Ê Disconnect all power cords from the properly grounded power outlets Ê Connect all cables to the server and peripherals Ê Connect all data communication cables into the utility sockets Ê Connect all power cords into the properly grounded power outlets Disconnecting cables Ê Switch off the server and equipment switches Ê Disconnect all pow...

Страница 68: ...onitor Ê Connect the keyboard and mouse to the USB connectors of the server Ê Connect the monitor to one of the two video connectors at the front or rear I The front video connector is designed for maintenance issues If you connect a monitor to the video connector at the front the video connector at the rear is deactivated A monitor connected to the front must have at least the same resolution as ...

Страница 69: ...ce Manual 5 5 3 1 Connecting the power cord AC PSU V CAUTION The AC PSU adjusts automatically to any power voltage in the range from 100 V 240 V AC PSU Platinum or 200 V 240 V AC PSU Titanium You may only operate the server if its rated voltage range corresponds to the local mains voltage Ê Connect the power cord to the PSU Ê Connect the main plug to an power outlet of the rack socket strip Ê Ensu...

Страница 70: ...that the power cord cannot be disconnected from the server by mistake The cable clamp is included in the accessories pack that is delivered together with the server Figure 17 Using cable clamps Ê Pull the cable clamp up 1 Ê Thread the power cord through the cable clamp 2 Ê Press the cable clamp down until it engages to secure the cable 3 ...

Страница 71: ...nvironment see Ambient conditions on page 101 When operating the server out of the specified temperature range the server may operate improperly and data loss may occur Furthermore Fujitsu cannot be held responsible for any related damage malfunction or loss of data etc Ensure that you wait for 10 seconds or more after power off before switching on the server again After connecting all power cords...

Страница 72: ...ers with identical hardware configurations Installation of drivers and additional software I The software that can be installed depends on the hardware configuration of your server This configuration is detected automatically 5 7 1 Configuring the server and installing the operating system I When using the ServerView Installation Manager you can configure the onboard controller either before or du...

Страница 73: ...ality see Notes on configuring controllers on page 75 5 7 1 2 Installing the operating system I For more information on installing the server see the ServerView Installation Manager user guide at http manuals ts fujitsu com under x86 Servers Software ServerView Suite Server Installation and Deployment Ê Open this manual Ê For the remote or local installation follow the instruction in this manual a...

Страница 74: ...f applicable configure the onboard SATA controller see Notes on configuring controllers on page 75 Ê If applicable configure the SAS SATA RAID controller with MegaRAID functionality see Notes on configuring controllers on page 75 5 8 1 2 Installing the operating system Ê Insert the DVD for the operating system you want to install Ê Reboot the server Ê Follow the instructions on screen and in the m...

Страница 75: ... configuration utility For more information see the Embedded MegaRAID Software User s Guide on the Fujitsu manuals server under x86 Servers Expansion Cards Storage Adapters LSI Configuration Software I In the BIOS the onboard SATA controller can be configured as RAID default or non RAID 5 9 2 Notes on SAS SATA RAID controllers I A separate utility is available to the controller for MegaRAID config...

Страница 76: ...om jp products computing servers primergy manual orthe attached manuals Linux operating system support About the Fujitsu Support Pack for Linux FJ LSP The FJ LSP can only be used from customers who have an contracted support as a tool to create an Fujitsu recommended Linux support environment The FJ LSP can be downloaded from the Fujitsu SupportDesk subscriber site SupportDesk web http eservice fu...

Страница 77: ...ove strike or shake the server when it is switched on This can damage the HDD SSD in the server and cause data loss Switch the server on when the temperature is in the specified temperature range For more information on the operating environment see Ambient conditions on page 101 When operating the server out of the specified temperature range the server may operate improperly and data loss may oc...

Страница 78: ... up green Ê Shut down the operating system properly The server is switched off automatically and enters standby mode The AC connected indicator lights up green I If the operating system does not turn off the server automatically press the On Off button for at least four seconds and or send a corresponding control signal for power button override V CAUTION There is a risk that data may be lost Othe...

Страница 79: ...obal icons of the iRMC web interface V CAUTION when switching off the power The operation of the power switch can be specified as Do Nothing Stand by Hibernate and Shutdown depending on the OS settings The default is Shutdown On this server functions corresponding to Stand by and Hibernate are supported as BIOS and hardware functions However some drivers and software installed in the server do not...

Страница 80: ...setting of the green hook in the accessible drive bay cover you can open the drive cover without turning the key or only with turning the key Ê Open the accessible drive bay cover carefully in the direction of the arrow 2 until the cover is released and remove it V CAUTION Do not pull too hard to avoid damage to the locking mechanism Ê Place the accessible drive bay cover on the HDD bay cover 3 Ê ...

Страница 81: ...structed The drive cover is replaced and the server locked in the reverse order 6 2 2 Removing the HDD bay cover Figure 19 Removing the HDD bay cover Ê Turn the key counterclockwise 1 to unlock the drive cover and remove the key Ê Open the HDD bay cover in the direction of the arrow and remove it 2 The HDD bay cover is replaced and the server locked in the reverse order ...

Страница 82: ...moving a 3 5 inch HDD dummy module Figure 20 Removing a 3 5 inch dummy module Ê Press both tabs together 1 and pull the dummy module out of its bay 2 V CAUTION Keep the dummy module for future use Always replace dummy modules into unused HDD bays to comply with applicable EMC regulations and satisfy cooling requirements ...

Страница 83: ...e 22 Installing the 3 5 inch HDD module Ê Install the HDD module into a drive bay and carefully push back as far as it will go 1 Ê Close the locking lever to lock the HDD module in place 2 Ê When using a RAID array add the additional HDD SSD to the RAID array I Configuring the RAID array see the documentation of the RAID controller used in your configuration see section Documentation overview on p...

Страница 84: ...bs together 1 and pull the dummy module out of its bay 2 V CAUTION Keep the dummy module for future use Always replace dummy modules into unused HDD SSD bays to comply with applicable EMC regulations and satisfy cooling requirements 6 3 2 2 Installing a 2 5 inch HDD SSD module Figure 24 Opening the 2 5 inch HDD SSD module locking lever Ê Pinch the green locking clip 1 and open the locking lever 2 ...

Страница 85: ...bay and carefully push back as far as it will go 1 Ê Close the locking lever to lock the HDD SSD module in place 2 Ê When using a RAID array add the additional HDD SSD to the RAID array I Configuring the RAID array see the documentation of the RAID controller used in your configuration see section Documentation overview on page 13 ...

Страница 86: ...move the dummy cover 2 V CAUTION Keep the dummy cover for future use If a PSU is removed and not immediately replaced by a new one a dummy cover must be installed in the bay again to comply with applicable EMC regulations and satisfy cooling requirements 6 4 2 Installing a PSU Figure 27 Folding up the handle Ê Push the handle of the PSU halfway upward in the direction of the arrow ...

Страница 87: ...e PSU engages correctly in the bay and is locked in position This is the only way to prevent the PSU from sliding out of its bay and being damaged during transportation Figure 29 Installing the cable tie Ê Push the cable clamp into the corresponding hole until it clicks in Ê Connect the power cord to the PSU see section Connecting the power cord on page 69 Ê If applicable configure the redundant p...

Страница 88: ...hat contain abrasives or may corrode plastic Ensure that no liquid enters the system Ensure that the ventilation areas of the server and the monitor are clear Do not use any cleaning sprays including flammable types It may cause a device failure or a fire Clean the keyboard and the mouse with a disinfecting cloth Wipe the server and monitor casing with a dry cloth If particularly dirty use a cloth...

Страница 89: ...lso make a list of any error messages that were displayed Ê Switch off the server Ê Contact our customer service team I The meaning of the error message is explained in the documentation for the relevant components and programs available online at http manuals ts fujitsu com Power on indicator remains unlit after you have switched on your device Cause Troubleshooting Power cable incorrectly connec...

Страница 90: ...nd enter the appropriate password Brightness control is set to dark Ê Set the brightness control on the monitor to light For more information see the operating manual supplied with your monitor Cause Troubleshooting Wrong horizontal frequency or resolution selected Ê Find out which horizontal frequency your monitor screen supports You will find the horizontal frequency also known as line frequency...

Страница 91: ...ror Cause Troubleshooting Mouse driver not loaded Ê Check whether the mouse driver is properly installed and is activated when the application program is started Detailed information can be found in the user manuals for the mouse the operating system and the application program Cause Troubleshooting Typing the keyboard does not display any characters or the mouse cursor does not move Ê Check to se...

Страница 92: ...tively I Note that the operating system may affect the system time For example the operating system time may deviate from the system time under Linux and would overwrite the system time in the default setting on shutdown The lithium battery is discharged Ê If the date and time are still wrong after the server has been switched off and back on again replace the lithium battery see the FUJITSU Serve...

Страница 93: ...per limit of the temperature boundaries Ê Although continued use within the temperature boundaries poses no problems within itself reconsider the surrounding environment conditions if this log is output or if ServerView issues this notification Cause Troubleshooting RAID controller is not configured for this drive The drive was probably installed when the system was switched off Ê Reconfigure the ...

Страница 94: ...ard devices not recognized Ê Reinstall the drivers for the expansion cards or onboard devices that are not recognized Cause Troubleshooting RAID controller configuration incorrect Ê Check and correct the settings for the drives using the RAID controller configuration program I For more information see the Integrated RAID for SAS User s Guide available online at http manuals ts fujitsu com under x8...

Страница 95: ...D DVD BD is inserted properly If the CD DVD BD is not inserted correctly insert the disk so that the label is facing up Ê Check to see whether the CD DVD BD is not dirty If the CD DVD BD is dirty wipe it in a radial way with a soft dry cloth Ê Check to see whether the CD DVD BD is not scratched or bent If scratched or damaged replace the CD DVD BD ...

Страница 96: ...96 Operating Manual TX2550 M5 Troubleshooting and tips ...

Страница 97: ...vers For Japan http www fujitsu com jp products computing servers primergy System board Memory modules configuration System board type D3386 Chipset Intel C624 series Processor CPU CPU quantity and type 1 or 2 Intel Xeon CPUs Platinum Gold Silver Bronze Memory slots 12 6 DIMMs per CPU 1 DIMM per channel Memory types RDIMM LRDIMM DDR4 NVM LRDIMM Memory capacity min max 8 GB 1536 GB Memory protectio...

Страница 98: ...e A Graphics 15 pin 1 x VGA Serial 1 9 pin 1 x serial RS 232 C usable for iRMC S5 or system or shared optional LAN Ethernet OCP option 2 x 10 GBit s RJ45 2 x 10 GBit s SFP Management LAN RJ45 1 x dedicated management LAN port for iRMC 10 100 1000 Mbit s Management LAN traffic can be switched to shared onboard converged network adapter ...

Страница 99: ... up to 12 Gbit s SAS 6 Gbit s SATA 8 Gbit s PCIE 16 ports internal 8 ports external RAID level 0 1 1E 10 5 50 6 60 4 8 GB cache optional FBU SATA controller 1x SATA controller integrated on the system board up to eight SATA HDDs SSDs can be connected to the controller The LSI Embedded MegaRAID software Software RAID supports RAID levels 0 1 10 1x single SATA3 connector for ODD 2x M 2 connector wit...

Страница 100: ...D Controller occupies 1 x PCI Express not available when expander is mounted Hard disk bay configuration Up to 32x hot plug 2 5 inch or up to 12x hot plug 3 5 inch Up to 8x PCIe SSD Accessible drive bays Up to 3x 1 6 inch drive bays for ODD or backup Floorstand W x D x H 177 mm x 777 mm x 456 mm Rack W x D x H 482 6 mm bezel 448 mm body x 736 mm x 177 mm Height unit rack 4 U Mounting depth rack 74...

Страница 101: ...ion Electrical data 450 W Platinum Environment class 3K2 Environment class 2K2 EN 60721 IEC 721 Part 3 3 EN 60721 IEC 721 Part 3 2 Temperature Operation 3K2 Transport 2K2 5 C 40 C with Fujitsu ATD 40 5 C 45 C with Fujitsu ATD 45 10 C 35 C without Fujitsu ATD 25 C 60 C Humidity 10 85 non condensing Condensation during operation must be avoided Standard configuration Sound power level LWAd ISO 9296 ...

Страница 102: ... Titanium Electrical data 1200 W Platinum Rated voltage range 100 V 240 V Frequency 50 Hz 60 Hz Max rated current 9 0 A 3 5 A Rated voltage range 200 V 240 V Frequency 50 Hz 60 Hz Max rated current 4 5 A Rated voltage range 100 V 120 V 200 V 240 V Frequency 50 Hz 60 Hz Max rated current 10 5 A 5 0 A ...

Страница 103: ...2 2 No 60950 1 07 2nd Edition am 1 am 2 CAN CSA C22 2 No 62368 1 2014 UL 60950 1 2ed am1 am2 UL 62368 1 2014 Australia New Zealand AS NZS 62368 1 AS NZS 60950 1 Taiwan CNS 14336 1 China GB 4943 1 India IS 13252 1 Electromagnetic compatibility International CISPR 32 CISPR 24 Europe EN 55032 Class A EN 55024 EN 61000 3 2 EN 61000 3 3 EN 300386 on demand USA Canada FCC 47CFR part 15 Class A ICES 003 ...

Страница 104: ...he requirements of Class A CISPR 22 32 This device can cause radio interference in residential areas Korea KN 32 KN 35 CE marking to EU directives Europe Low Voltage Directive 2014 35 EU Electromagnetic Compatibility 2004 30 EU RoHS Compliance Europe EN 50581 Taiwan CNS 15663 ...

Страница 105: ...tp manuals ts fujitsu com under x86 Servers Safety Eco Warranty For Japan http www fujitsu com jp products computing servers primergy support For the warranty regulations select 製品保証ご案内 無償修理期間 Service Telephone numbers of the local service partner can be found online at http ts fujitsu com support servicedesk html ...

Страница 106: ...106 Operating Manual TX2550 M5 Warranty and service ...

Отзывы: