32
Operating Manual
TX2550 M5
Product description
6
AC
connected
indicator
green on
– The server is switched off and
connected to the mains (standby
mode).
– The server has been switched on
but Power Cycle Delay settings
delay it from turning on for a
specified time.
I
After connecting the server to
the mains, it will take about 60
seconds until the server will
enter standby mode and can
be switched on.
off
– The server is switched off and not
connected to the mains.
– The server is switched on and
operating normally.
Pos. Label
Indicator
Status
Description
Содержание PRIMERGY TX2550 M5
Страница 1: ...Operating Manual English FUJITSU Server PRIMERGY TX2550 M5 Operating Manual May 2019 ...
Страница 6: ...Operating Manual TX2550 M5 ...
Страница 10: ...Operating Manual TX2550 M5 Content ...
Страница 12: ...12 Operating Manual TX2550 M5 Introduction ...
Страница 16: ...16 Operating Manual TX2550 M5 Before you start ...
Страница 42: ...42 Operating Manual TX2550 M5 Product description ...
Страница 56: ...56 Operating Manual TX2550 M5 Important information ...
Страница 96: ...96 Operating Manual TX2550 M5 Troubleshooting and tips ...
Страница 106: ...106 Operating Manual TX2550 M5 Warranty and service ...