3-4 ELECTRONIC EXPANSION VALVE CONTROL
03-09
3-5 DRAIN PUMP OPERATION
1. Initialization
2. Operation Control
When starting up
Automatic operatic control
Automatic PI control is performed based on the indoor unit heat exchanger outlet temp and inlet temp.
Room temperature control
The room temperature is controlled so that it reaches to the set-up temperature based on the difference
between the room temperature and the set-up temperature, and the change of indoor unit temperature.
if the room temperature becomes 0.5 C lower than the set-up temperature, EEV is fully closed.
3. Special Control
(1) When cooling and refrigerant circulation starts, the drain pump starts simultaneously.
(2) The drain pump operates continuously for 3 minutes after the refrigerant circulation stopped.
(3) When the refrigent circulation is stopped by a start of indoor heat exchanger frost prevention
operation, the drain pump will turn off in 1 hour after the end of indoor heat exchanger frost
prevention operation.
(4) When the water level in the drain pan rises up and then the float switch functions:
Microcomputer stops the refrigerant circulation and indoor fan motor operation.
Drain pump operates continuously for 3 minutes after the float switch is turned off.
(Almost condensing water may be drained)
(5) When the float switch turns ON continuously for 3 minutes, 'FAILURE INDICATION' operates.
(6) When the float switch turns OFF within 3 minutes, the unit starts cooling operation.
1
2
When the power is turned ON.
When it has passed the limited time since the last initialization.
When indoor unit stopping
Oil recovery operation : Controlled pulse.
Test run operation : Controlled pulse.
Icing protection control : Fully closed.
Pump down operation : Fully open.
Defrost operation : Controlled pulse
Outdoor unit Condition
EEV Condition
Cooling
Heating
Fully closed
Slightly open
(Cooling) Move to the cooling control base pulse in steps.
(Heating) Move to the heating control base pulse in steps.
OFF
Fully closed
Содержание AIRSTAGE V-II
Страница 2: ......
Страница 6: ...1 TEST RUN ...
Страница 7: ......
Страница 22: ...2 OUTDOOR UNIT OPERATION CONTROL ...
Страница 23: ......
Страница 39: ...3 INDOOR UNIT OPERATION ...
Страница 40: ......
Страница 59: ...4 TROUBLE SHOOTING ...
Страница 60: ......
Страница 187: ...5 APPENDING DATA UNIT ...
Страница 188: ......
Страница 193: ...MODELS AUXB07 AUXB09 AUXB12 AUXB14 AUXB18 AUXB24 05 05 5 2 WIRING DIAGRAM 5 2 1 Indoor Unit ...
Страница 194: ...MODELS AUXD18 AUXD24 AUXA30 AUXA36 AUXA45 AUXA54 05 06 ...
Страница 195: ...MODELS ARXB07 ARXB09 ARXB12 ARXB14 ARXB18 05 07 ...
Страница 196: ...MODEL ARXB24 MODELS ARXB30 ARXB36 05 08 ...
Страница 197: ...MODEL ARXB45 05 09 ...
Страница 198: ...MODEL ARXA24 MODELS ARXA30 ARXA36 ARXA45 05 10 ...
Страница 199: ...MODELS ARXC36 ARXC45 ARXC60 MODELS ARXC72 ARXC90 05 11 ...
Страница 200: ...MODELS ARXD07 ARXD09 ARXD12 ARXD14 ARXD18 ARXD24 05 11 1 ...
Страница 201: ...MODELS AB A12 AB A14 AB A18 AB A24 05 12 ...
Страница 202: ...MODELS AB A12LBTH AB A14LBTH 05 12 1 AB A18LBTH AB A24LBTH ...
Страница 203: ...05 13 MODELS AB A30 AB A36 AB A45 AB A54 ...
Страница 204: ...05 13 1 MODELS AB A30LBTH AB A36LBTH AB A45LBTH AB A54LBTH ...
Страница 205: ...MODELS AS A07 AS A09 AS A12 AS A14 05 14 ...
Страница 206: ...MODELS AS E07 AS E09 AS E12 AS E14 05 15 ...
Страница 207: ...MODELS AS A18 AS A24 AS A30 05 16 ...
Страница 208: ...05 16 1 MODELS AS A18LACH AS A24LACH AS A30LACH ...
Страница 216: ...6 DISASSEMBLY PROCESS ...
Страница 217: ......
Страница 218: ......
Страница 219: ......
Страница 220: ......
Страница 221: ......
Страница 222: ......
Страница 223: ......
Страница 225: ......
Страница 226: ......