Before execution
Execution
Execution zone decision
Confirmation of refrigerant used
Preparation of execution drawings
Confirmation of installation site
Preparations before execution
Execution procedure and precautions
Reason
01-01
1-1
EXECUTION PROCEDURE AND EXECUTION PRECAUTIONS
1. TEST RUN
Sleeve and insert work
Indoor unit installation
Refrigerant piping work
Drain piping work
Duct work
Heat insulation work
Electrical work
Outdoor unit foundation work
Outdoor unit installation
Refrigerant piping connection work
Air tightness test
Vacuum drying
Check the characteristics of the refrigerant used and grasp the
special features of the refrigerant. If refrigerant must be charged,
always charge the refrigerant specified for the product.
Confirm the product design pressure.
R410A 4.20MPa
Use new refrigerant piping of the thickness specified by the
D&T manual.
Since R410A dedicated tools are necessary, prepare them
in advance.
Absolutely avoid use of existing piping. If use of existing
piping is unavoidable, the piping must be cleaned.
Use of a refrigerant other than the
specified refrigerant will invite
equipment trouble.
Secure the necessary pressure
resistance.
Use pipe that is not dirty inside.
When the pipe is left standing, protect it.
Finish flaring exactly.
Confirm the width across flats dimension and shape of flare nuts.
Always blow nitrogen while brazing.
Perform flushing before connecting the equipment.
Always make the downward slope of the drain pipe 1/100 or
greater and make the horizontal length within 20m.
Use hard polyvinylchloride pipe as the drain pipe.
Support the drain pipe between 1.5 to 2.0m.
Use pipe of 1 rank up (VP30 or greater) as central piping.
Prevention of water leakage
Foreign matter, water, etc. in the
piping will cause faulty cooling and
compressor trouble.
Refrigerant leakage will cause low
performance and abnormal stopping.
Prevention of water leakage
Prevention of water leakage
Refrigerant leakage will cause low
performance and abnormal stopping.
Refrigerant leakage will cause low
performance and abnormal stopping.
Mixing in of vacuum pump oil by
reverse flow will cause equipment
trouble.
Prevents degradation of the oil by
completely removing water and air.
Always use a level and keep the indoor unit level.
If the equipment is tilted toward the drain port, install it so that the tilt is
within 10mm. Excessive tilt will cause water leakage.
When performing piping work, observe the following items so that the
inside of the piping is clean and air tight.
Select the size of the heat insulating material according to the ambient
temperature and relative humidity of the refrigerant.
Use a heat insulating material having a heat conductivity of 0.043W/
(m
.
k) or less.
When making flare connections always use a torque wrench and
tighten the flare nut positively to the specified torque.
Pressurize the product with nitrogen gas up to the design pressure
and conduct a 24Hr air tightness test.
Install a vacuum pump with reverse flow check mechanism or a
reverse flow check adaptor to a conventional vacuum pump and
use.
Pump down sufficiently.
Approximately 1 hour or longer after -0.10MPa reached.
Allow to stand for approximately 1 hour after stopping the vacuum
pump and confirm that the needle does not return.
Air purging using refrigerant is strictly prohibited.
1
2
1
1
1
2
3
2
3
4
5
6
1
2
3
4
2
3
Vaccuming mode
This function is used for vacuuming the indoor unit and the connection piping.
When the [vacuuming mode] is set, <Push switch setting, F3:21>
EEV of connected all indoor units opens.
So, the vacuuming indoor unit and piping becomes easier.
When the vacuuming ends, please turn off the power supply of the indoor
and outdoor unit, [vacuuming mode] is released.
*
recommend the vacuuming
mode
*
Содержание AIRSTAGE V-II
Страница 2: ......
Страница 6: ...1 TEST RUN ...
Страница 7: ......
Страница 22: ...2 OUTDOOR UNIT OPERATION CONTROL ...
Страница 23: ......
Страница 39: ...3 INDOOR UNIT OPERATION ...
Страница 40: ......
Страница 59: ...4 TROUBLE SHOOTING ...
Страница 60: ......
Страница 187: ...5 APPENDING DATA UNIT ...
Страница 188: ......
Страница 193: ...MODELS AUXB07 AUXB09 AUXB12 AUXB14 AUXB18 AUXB24 05 05 5 2 WIRING DIAGRAM 5 2 1 Indoor Unit ...
Страница 194: ...MODELS AUXD18 AUXD24 AUXA30 AUXA36 AUXA45 AUXA54 05 06 ...
Страница 195: ...MODELS ARXB07 ARXB09 ARXB12 ARXB14 ARXB18 05 07 ...
Страница 196: ...MODEL ARXB24 MODELS ARXB30 ARXB36 05 08 ...
Страница 197: ...MODEL ARXB45 05 09 ...
Страница 198: ...MODEL ARXA24 MODELS ARXA30 ARXA36 ARXA45 05 10 ...
Страница 199: ...MODELS ARXC36 ARXC45 ARXC60 MODELS ARXC72 ARXC90 05 11 ...
Страница 200: ...MODELS ARXD07 ARXD09 ARXD12 ARXD14 ARXD18 ARXD24 05 11 1 ...
Страница 201: ...MODELS AB A12 AB A14 AB A18 AB A24 05 12 ...
Страница 202: ...MODELS AB A12LBTH AB A14LBTH 05 12 1 AB A18LBTH AB A24LBTH ...
Страница 203: ...05 13 MODELS AB A30 AB A36 AB A45 AB A54 ...
Страница 204: ...05 13 1 MODELS AB A30LBTH AB A36LBTH AB A45LBTH AB A54LBTH ...
Страница 205: ...MODELS AS A07 AS A09 AS A12 AS A14 05 14 ...
Страница 206: ...MODELS AS E07 AS E09 AS E12 AS E14 05 15 ...
Страница 207: ...MODELS AS A18 AS A24 AS A30 05 16 ...
Страница 208: ...05 16 1 MODELS AS A18LACH AS A24LACH AS A30LACH ...
Страница 216: ...6 DISASSEMBLY PROCESS ...
Страница 217: ......
Страница 218: ......
Страница 219: ......
Страница 220: ......
Страница 221: ......
Страница 222: ......
Страница 223: ......
Страница 225: ......
Страница 226: ......