27
Step 9: For cold climate installations, please install insulated risers and access covers and cover
upper half of treatment unit with min. R-8 value insulating material (i.e. foam board).
Step 10: Float switch electrical cord should exit riser wall through a male adaptor
(caulked watertight to prevent septic gas leakage) or watertight fitting. An interior
connection to direct burial cable is also an acceptable option.
For connection of float switch cord to alarm panel,
drill hole in riser and use male fitting and electrical
conduit. Plug fitting with sealant standard that
meets ASTM C990-96 to assure water-tight seal and
to prevent septic gas transmission into control
panel.
Step 11: Backfill up to under slab level. Make sure to
compact tightly.
Water
Содержание CE6KG
Страница 29: ...29 Step 12 continued Rebar arrangement details ...
Страница 33: ...33 M Control Panel Wiring Diagram p 1 ...
Страница 34: ...34 M Control Panel Wiring Diagram p 2 ...
Страница 37: ... A Control Panel Wiring Diagram p 2 37 ...