16
Step 1: Excavation
Prepare excavation to be Fuji Clean
treatment system dimensions as
listed on page 7 and concrete slab
dimensions on page 22.
1
2
Step 2: Compact stone base
Installation Procedure for H-20, HS-20
Unloading Instructions:
Upon delivery, inspect Fuji Clean tank, both outside and inside for possible damage incurred during
transport. If you find damage, or have a question, please contact your distributor immediately.
Required Preconditions for this Installation Technique
Seasonal high groundwater depth must be less than 3’3” (1000mm).
Total height from ground level to adapter ring should be 24 inches.
Bearing power of soil must be 8.7 PSI or greater.
Important Note: Total height from ground level to adapter ring should be 24 inches.
Make sure excavation of slope should be 2:1 as a zone of influence. If slope will be gentle due
to weak foundation, install landslide protection wall.
Содержание CE6KG
Страница 29: ...29 Step 12 continued Rebar arrangement details ...
Страница 33: ...33 M Control Panel Wiring Diagram p 1 ...
Страница 34: ...34 M Control Panel Wiring Diagram p 2 ...
Страница 37: ... A Control Panel Wiring Diagram p 2 37 ...