11
Step 6 continued.: Install inlet and outlet pipes using primer and cement. For larger systems with 5”
inlet and outlets, you may use 5”: 4” eccentric reducer adapters included with system. Install with
thin edge down. Apply primer and cement to 4” PVC pipe sections to inlet and outlet.
Step 6: Backfill about 3/4 way up tank in layered, compacted 6” lifts using sand, stone dust,
peastone or equivalent material that form-fits into tank corrugations. Keep backfill material
damp to assure compact backfill and reduce settling risk.
Please note: To assure tank water tightness, check in 24 hours to be sure that the water level
has not dropped. Contact your distributor or Fuji Clean USA if water level has dropped.
Step 5: After rechecking that tank is level to 1/8” per 2 feet (10mm
per 2 meter or 1/200), (fore and aft as well as side to side), fill tank
with fresh water to the low water line in ALL 3 chambers.
Note: Start with center chamber and alternate chambers while filling
for evenly balanced fill.
Содержание CE6KG
Страница 29: ...29 Step 12 continued Rebar arrangement details ...
Страница 33: ...33 M Control Panel Wiring Diagram p 1 ...
Страница 34: ...34 M Control Panel Wiring Diagram p 2 ...
Страница 37: ... A Control Panel Wiring Diagram p 2 37 ...