20
Step 10: In nearly all cases, the Fuji Clean treatment system will vent properly through the building’s
septic influent line. In cases where there is an influent pump, or in severe downdraft locations, a
separate vent should be considered. If you do choose to install a vent, be sure that the vent slopes
toward the tank so that any moisture accumulation drips back down toward the tank.
3” port for optional air vent line. If not used,
install plug in port by turning clockwise to tighten.
(Note: 2 ports in CE21, 30, CEN14 and 21).
If optional air vent line is installed,
slope conduit toward tank to
prevent moisture accumulation
Local regulations may specify required vent pipe
diameter.
Keep horizontal vent pipe as short as possible.
Vertical pipe length should be 2 times longer than
horizontal.
Installation of a positive flow ventilation fan
facilitates better ventilation.
Greater temperature differential between tank and
outside air facilitates more effective ventilation.
Step 11: Backfill up to slab
base. Compact tightly. Keep
backfill material damp to
assure compact backfill and
reduce settling risk.
Note: Bearing power of soil
under slab should be 4.4PSI
or more.
Water
ONE unit
<16 feet
>16 feet
Commercial
3” (φ75)
4” (φ100)
Vent pipe diameter
One vent line is able to connect system clusters of
2 to 4 units with 4" diameter pipe.
Joining point of tank and vent line within 16feet.
In case of over 5 units, use two (2) vent lines.
Содержание CE6KG
Страница 29: ...29 Step 12 continued Rebar arrangement details ...
Страница 33: ...33 M Control Panel Wiring Diagram p 1 ...
Страница 34: ...34 M Control Panel Wiring Diagram p 2 ...