6 | Installation
66
M1820921_en | Installation instructions Dual fuel boiler SP Dual compact
Once the individual components have been wired:
Mains connection:
Netz
r
Providing network connection
Ä
The power supply line (network connection) must be fitted with a max. C16A fuse
by the customer!
Ä
Observe the circuit diagrams in the boiler controller operating instructions.
Ä
Flexible sheathed cable must be used for the wiring; this must be of the correct
size to comply with applicable regional standards and regulations
6.10.3 Connect the components of the pellet unit
r
Lift off the cover of the firewood boiler
r
Undo the screws and contact washers on the controller box and remove the controller
cover
r
Open the insulated door of the pellet unit and remove the cover plate behind the door
r
Run the cable through the perforated opening (A) to the firewood boiler controller box
and plug into the boards: