Installation | 6
M1820921_en | Installation instructions Dual fuel boiler SP Dual compact
53
If the firewood boiler and the pellet unit are not parallel, the gap (X) can be adjusted using
the adjusting screws (A - galvanized yellow – AF 13 mm):
Example 1 – Large gap (X) at the back
X
r
Loosen the adjusting screw at the back (A) and tighten the flange screw connections
(B) until the size of the gap is the same, both front and back
r
Tighten all of the screw connections (A and B) once again
Example 2 – Large gap (X) on the bottom
X
r
Loosen the bottom adjusting screws (A) and tighten the flange screw connections (B)
until the size of the gap is the same, both top and bottom
r
Tighten all of the screw connections (A and B) once again
r
Attach the base frame of the pellet unit both front and back to the firewood boiler using
two screws and spacer washers