![Fritsch PULVERISETTE 5 Скачать руководство пользователя страница 56](http://html.mh-extra.com/html/fritsch/pulverisette-5/pulverisette-5_operating-instructions-manual_2338419056.webp)
9
Maintenance
DANGER!
Mains voltage
– Before beginning with maintenance work, unplug
the mains plug and protect the device against being
unintentionally switched back on again!
– Indicate maintenance work with warning signs.
– Maintenance work may only be performed by spe-
cialised personnel.
– Put safety equipment back into operation after
maintenance or repair work
NOTICE!
Send all Safe-Lock clamping systems to Fritsch GmbH
once a year for inspection. The customer must bear the
costs of this maintenance itself.
We recommend keeping a safety logbook
„Safety logbook“ on page 67, where all work (mainte‐
nance, repairs......) performed on the device is entered.
The most important element of maintenance is regular
cleaning:
Functional part
Task or description
Test
Maintenance interval
Safety lock
Hood lock (7)
Is the closed hood (3)
locked in place when the
main switch is off?
If this test is failed, do not
continue to work until the
fault has been rectified.
Before each use
Rotating bearings
Permanent lubrication
Bearing clearance
Every 2,000 h or annually
Drive motor
Permanent lubrication
Bearing clearance
Every 4,000 h or annually
Maintenance
- 56 -
Содержание PULVERISETTE 5
Страница 55: ...8 2 Device n The planetary mill can be wiped down with a damp cloth when it is switched off Cleaning 55 ...
Страница 67: ...15 Safety logbook Date Maintenance Repair Name Signature Safety logbook 67 ...
Страница 68: ...Date Maintenance Repair Name Signature Safety logbook 68 ...
Страница 71: ......