5
Initial start-up
Perform initial start-up only after all work as described in
„Installation“ on page 20 has been carried out.
5.1 Switching on
n
The device must be connected to the power supply if this has not
been done already.
n
Switch on the device with the main switch (10) on the back side of
the device.
n
The POWER SUPPLY lamp on the control panel lights up.
5.2 Function check
CAUTION!
Conduct the functional test at a speed of 100 1/min!
n
Open the hood (3).
n
Take out the grinding bowl tensioning device (Safe-Lock) and trans-
port securing device (wooden block). No loose parts may remain
inside the device.
n
Close the hood (3).
n
Set the speed to 100 1/min. (See
n
Press START on the control panel.
n
The hood (3) is locked and the mill starts up at the preselected
speed.
Initial start-up
- 27 -
Содержание PULVERISETTE 5
Страница 55: ...8 2 Device n The planetary mill can be wiped down with a damp cloth when it is switched off Cleaning 55 ...
Страница 67: ...15 Safety logbook Date Maintenance Repair Name Signature Safety logbook 67 ...
Страница 68: ...Date Maintenance Repair Name Signature Safety logbook 68 ...
Страница 71: ......