1.
Loosen the two clamping screws and position the feeder under the
2 fasteners.
2.
Re-tighten the clamping screws.
3.
Pay attention to the falling chute when positioning the feeder. The
overhang of the channel has to be adjusted to the type and size of
particles.
4.
The scale has to be visible on the front, to the left of the clamp.
The feeder is positioned at position 0, precisely in the middle of
the falling chute.
5.
Next, move the funnel holder to the lowest point using the knurled
screw.
6.
Loosen the clamp screws of the funnel holder and position one of
the two funnels.
Make sure the large funnel is sitting in the two
grooves on the top of the funnel holder.
7.
Re-tighten the clamp screws.
Using the device
- 35 -
Содержание ANALYSETTE 28 IMAGESIZER
Страница 6: ...14 Index 63 Table of contents 6 ...
Страница 61: ...13 Safety logbook Date Maintenance Repair Name Signature Safety logbook 61 ...
Страница 62: ...Date Maintenance Repair Name Signature Safety logbook 62 ...
Страница 65: ......